<br /> O George Hayner, P.E., CxA
<br /> • Mechanical Engineer
<br /> ® Mr. Hayner has 10 years of experience in HVAC engineering analysis, design and
<br /> construction administration for a variety of building types including governmental,
<br /> ® �- educational, and commercial facilities. Mr. Hayner has experience in the
<br /> ® '•.\ . commissioning management plan of mechanical systems including, but not limited
<br /> to, fire protection systems, all types and sizes of HVAC systems, high temperature
<br /> ® hot water boilers, piping, fluid systems, chilled water, compressed gas systems,
<br /> ® elevators, hoists and cranes, specialized mechanical equipment and controls
<br /> i.� (including direct digital control (DDC), and programmable logic controllers (PLC), as
<br /> ® well as facilities to house the mechanical equipment. Mr. Hayner is well
<br /> experienced in designing integrated city/campus-wide Building Automation
<br /> ® Systems. George's knowledge of designing innovative solutions to accelerated
<br /> Q return on energy efficiency includes design of Energy Recovery Wheels for Child
<br /> Development Centers on MacDill and Hudburt U.S. Air Force Bases. Additionally,
<br /> ® Mr. Hayner has knowledge of EPA Energy Star Portfolio Manager.
<br /> •
<br /> YEARS EXPERIENCE:�i Project Experience
<br /> ® RIMED etkaaE003 On-Going, Flagler County Courthouse Annex Sherriff's Department
<br /> ® Renovations and Energy Efficient Upgrades, Bunnell, FL — Mr. Hayner is a
<br /> EDUCATION Mechanical Engineer for the renovations to accommodate the needs of the sheriffs
<br /> ® Bachelor J Mechanical operations. Renovations include the following: Add fire sprinkler system,
<br /> ® Engineering replacement of the main fire alarm panel, repair exterior windows, confirm fire rated
<br /> University of to� k�J Florida,gam separation between Historic Courthouse and Annex, replace NC ductwork, VAV
<br /> ® REGISTRATION units and controls, provide a ducted return system, test and balance the new
<br /> ® Registered Professional Engineer system, replace all lighting with energy efficient fixtures and lighting controls,
<br /> =Florida#70682 replace electrical power distribution system, new communications data and
<br /> ® technologies equipment, renovate all restrooms to ADA standards, replace all
<br /> suspended acoustical ceilings and grid with new efficient acoustic values, replace
<br /> • /gig Certified Commissioning all water heaters with energy efficient units.
<br /> Authority(CxA)
<br /> ® 2011, George Mason University High Efficiency Boiler Replacement, Fairfax,
<br /> ® VA — Mr. Hayner is a Mechanical Engineer for this boiler replacement. SGM
<br /> created demolition drawings for the existing package boiler and connecting fuels,
<br /> o system hot water and make-up water piping and boiler breaching. SGM created
<br /> e demolition drawings for the electrical connections and controls. SGM created
<br /> construction drawings for the installation of Hi-efficiency modular boilers, redundant
<br /> • hot water pumps, and replacement expansion tank and updated controls. SGM
<br /> created a sequence of operations for cycling of the new boilers with a reset
<br /> • schedule dictated by outside air and supply water temperatures. SGM created a
<br /> • mechanical and electrical book spec with General Conditions and Front End
<br /> documents by the Architect and University personnel respectively. SGM created an
<br /> ® approximate construction cost estimate. SGM provided construction administration
<br /> for the project duration for review of submittals and RFI responses. SGM attended
<br /> ® three construction meetings at owner's request. SGM performed substantial and
<br /> ® final completion inspections and review close-out documents. SGM provided an
<br /> electronic DWG As built drawing from the contractor's red-line drawings.
<br /> ® 2011, UCF, Apollo Community Residents— High efficient HVAC Renovation to
<br /> ® Osceola, Lake Hall, Polk Hall, and Volusia Hall Upgrade and Replacements for
<br /> Energy Savings, Orlando, FL — Mr. Hayner provided Mechanical services for
<br /> ® University of Central Florida's Osceola Hall, Volusia Hall, Polk Hall and Lake Hall,
<br /> ® which included the upgrading of HVAC, electrical, architectural, fire protection, and
<br /> plumbing systems. HVAC included the installation of new chilled water distribution
<br /> ® piping, new air handling units and central control system. Electrical included a new
<br /> ® power distribution system and lighting with emergency back-up. Fire protection with
<br /> SMA central plant activation notification. Fire alarm system with central plant alarm
<br /> ® notification. Architectural with new door, windows, and room upgrades. Plumbing
<br /> with new hot and cold water distribution, fixtures and high efficiency hot water
<br /> • ENGINEERING= generating system.
<br /> • MEI'CONSULTING ENGINEERS