Laserfiche WebLink
• <br /> • <br /> • Mark Escott, P.E., LEED® AP, CxA <br /> • Electrical Engineer <br /> • Mr. Escott has 19 years of experience in electrical engineering which includes project <br /> • management, permitting, job costing, major purchases/subcontracts, submittals, <br /> • l= scheduling, manpower loading, field coordination, change order estimating, technical <br /> Y' assistance to field personnel, and project closeouts. Mr. Escott is skilled in the design <br /> ® '• of electrical systems including: power distribution, lighting, auxiliary generators, fire <br /> ® _ alarm, systems and audio. Mr. Escott has extensive experience with electrical <br /> renovations, alterations and additions for existing facilities. Areas of expertise include <br /> • r, I project design, lighting design, power system design, riser diagrams, panel <br /> I schedules, design and implement information systems, supply planning, EMF <br /> • : �, analysis, surge arrester protection, and distribution operations. <br /> • f ( Mr. Escott is skilled in the design of electrical systems including, but not limited to, <br /> t , uninterruptible power systems (UPS), fire alarm and detection systems, medium and <br /> • bt_ low voltage AC power systems, Electronic Security Systems (ESS), , computer power <br /> "_: - conditioning, grounding, lightning protection, lighting control systems, emergency <br /> YEARS E.XPERIENC;E19° power, hazardous area electrical installations, control and monitoring systems, cable <br /> • Witch SGM sin ek005 2 _{:, _x: tray systems, communications raceway systems, and communications premise <br /> • 9.. ' '.- <' ', ' wiring. <br /> EDUCATION '- --'2.; <br /> Mr. Escott will coordinate all electrical design requirements with design team and <br /> • Bachelor ml Electrical end-user personnel to insure all systems meet the standards and requirements of the <br /> • Engineering specific facility. <br /> University(.jjSouth Florida, 1989 <br /> • Project Experience <br /> • REGISTRATION 2012, Flagler County Courthouse Annex Sherriff's Department Renovations <br /> and Energy Efficient Upgrades, Bunnell, FL — Mr. Escott is an Electrical Engineer <br /> • Registered Professional Engineer, on the renovations to accommodate the needs of the sheriffs operations. <br /> 1996=Florida @507,37 Renovations include the following: Add fire sprinkler system, replacement of the main <br /> • fire alarm panel, repair exterior windows, confirm fire rated separation between <br /> LEED Accredited Professional Historic Courthouse and Annex, replace NC ductwork, VAV units and controls, <br /> • 2008 provide a ducted return system, test and balance the new system, replace all lighting <br /> • with energy efficient fixtures and lighting controls, replace electrical power distribution <br /> [ZCertified Commissioning system, new communications data and technologies equipment, renovate all <br /> • Authority restrooms to ADA standards, replace all suspended acoustical ceilings and grid with <br /> • new efficient acoustic values, replace all water heaters with energy efficient units. <br /> • 2011, Town of Palm Beach Street, Street Lighting, Town of Palm Beach, FL — <br /> Mr. Escott is an Electrical Engineer for this project. SGM was responsible for the <br /> • replacement and relocation of 46 street light that currently serve Dunbar Rd. to <br /> ® Sunrise Ave. SGM coordinated with their facilities maintenance staff to understand <br /> their needs, standards, determine a realistic schedule for the design/engineering <br /> • effort, meeting notes, probable construction cost estimate and finally obtained <br /> technical cut sheets of equipment desired such that aesthetic uniformity was <br /> • achieved in the type of light pole/fixture installed. SGM engineers visited the various <br /> • project locations to obtain existing data related to pole locations and sidewalk <br /> conditions. This effort will also constitute SGM to provide full Construction <br /> • Administration services for the one and one-half months construction (1.5 months) <br /> schedule desired by the Town of Palm Beach. Upon completion of the construction, <br /> • SGM is responsible for implementing the As-Built drawings and delivering the record <br /> • set to the Town as a CD and a hard copy 11x17 set of documents. <br /> • 2010 Orange County Fire & Rescue, Fire Station #35, Orlando, FL — Mr. Escott <br /> was an Electrical Engineer and Commissioning Agent on this project. SGM <br /> • developed the owners OPR documents, reviewed drawings during construction, <br /> ® developed the commissioning plan, attended construction meetings, witnessed <br /> S ^ equipment start up, performed functional performance tests on the equipment and <br /> ® (`JT provided Test & Balance services. Commissioning procedures were performed <br /> following the ACG guidelines and the requirements of LEED. <br /> • ENGINEERING= <br /> • MEP CONSULTING ENGINEERS <br /> • 39 <br /> 0 <br />