Laserfiche WebLink
0 <br /> S <br /> S Jim Kloes <br /> Construction Manager <br /> ® Mr. Kloes has over 46 years of experience in supervision, teaching, and knowledge <br /> ® - of HVAC, industrial and aeronautical piping and control systems. He has a <br /> diversified background with experience including educational, commercial, <br /> ®• i. I residential and industrial HVAC. Mr. Kloes' experience includes teaching <br /> tcertification, instructor training, Control Design Consultant and Project Engineer. <br /> ® �. � Mr. Kloes ensures the design professional is responsible for review of all shop <br /> ( drawings and submittals for their compliance with the contract documents. Mr. <br /> ® ��— +ir� -_ Kloes ensures the design professional will use a stamp containing a signature block <br /> which he or she will sign, or at a minimum initial. The stamp and a signed <br /> ® transmittal noting approval is adequate evidence that the submission conforms to <br /> • / the overall project design and can be integrated into such design. <br /> S '; During the construction administration phase of a project Mr. Kloes ensures many <br /> ® submittals, samples, catalogue cuts, etc. will not require the fabricator's <br /> certification. These will generally be for "off the shelf" items that represent <br /> ® YEARS EXPERIENCE: COstandardized products or systems. In these instances, the design professional <br /> ���� E E should be able to rely on the manufacturer's certification that the submittal meets <br /> S EDUCATION the design criteria, standardized tests, and/or association standards. The design <br /> S Certified Plumbing/PraMIN professional must still "review and approve" these submittals, but the signature and <br /> certification by the manufacturer's designer is not required. The manufacturer <br /> ® Instructor confirms to the contractor and the design professional the quantity and the quality <br /> Purdue(Ufj (1981) <br /> S of the product and that the contractor has the erection or installation drawings. <br /> • REGISTRATION Project Experience <br /> 2002.(� III, Control On-Going, Flagler County Courthouse Annex Sherriffs Department <br /> • Vaitli3 Renovations and Energy Efficient Upgrades, Bunnell, FL — Mr. Kloes is the <br /> S Construction Manager on the renovations to accommodate the needs of the <br /> sheriffs operations. Renovations include the following: Add fire sprinkler system, <br /> S replacement of the main fire alarm panel, repair exterior windows, confirm fire rated <br /> ® separation between Historic Courthouse and Annex, replace NC ductwork, VAV <br /> units and controls, provide a ducted return system, test and balance the new <br /> S system, replace all lighting with energy efficient fixtures and lighting controls, <br /> replace electrical power distribution system, new communications data and <br /> S technologies equipment, renovate all restrooms to ADA standards, replace all <br /> S suspended acoustical ceilings and grid with new efficient acoustic values, replace <br /> all water heaters with energy efficient units. <br /> • 2010, City of Orlando Events Center Parking Garage, Orlando, FL — Mr. Kloes <br /> S was the Construction Manager for this $34 million parking structure which serves <br /> the needs of the Orlando Events Center. Nestor provided systems designs for the <br /> S garage's CCTV high resolution video camera surveillance system on all levels at <br /> S strategic points of access. The design also included access control through the use <br /> of proximity card scanners at selected door locations. Fire alarm, area of rescue, <br /> S emergency phone system, ticket dispensers, toll gates, and communication <br /> ® systems were also include as part of the systems design. The systems design <br /> incorporated local and remote monitoring of all systems. <br /> S 2010, Orange County Convention Center, Orlando, FL — Mr. Kloes was the <br /> S Construction Manager for the new Variable Frequency Drives and Controls for all <br /> existing air handling units, fan, blowers and secondary chilled water pumps. SGM <br /> S was the Engineer of the record and responsible for a solid commissioning plan for <br /> ® this 4,200,000 sq. ft. facility, the second largest convention center in the nation. The <br /> new plan was an alteration to existing facilities HVAC system. As part of this <br /> ® SGMA A project, SGM is currently upgrading and replacing the existing multi manufacturer <br /> J 1�/ l HVAC building automation systems (BAS) to the most current hardware and <br /> • c software usingone manufacturer'sproduct. This BAS will be integrated through an <br /> ENG[NEER[NGa g 9 <br /> S MEP CONSULTING ENGINEERS enterprise level portal with remote accessibility. The goal is to integrate the campus <br /> wide buildings into one BAS web based access point.SGM is responsible for design <br /> S of new controls, energy management system in compliance with codes, <br /> development of specifications, sequence of controls, design and general <br /> S construction scheduling, cost estimating, and construction management. <br /> • 45 <br /> S <br />