Laserfiche WebLink
0 <br /> SGM Engineering, Inc. <br /> o ":7-- <br /> -I �= City of Sunny Isles Beach RFP No. 12-04-02 <br /> • ' • Continuing Professional Architectural & Engineering Services <br /> "C".1:-.10s) <br /> o�; Firms Only (CCNA) <br /> Section 4 - Approach and Methodology <br /> • Permitting: Permit applications will be prepared and submitted to the appropriate permitting agency. It is important <br /> for the Owner to have permits in-hand prior to the bidding of a project in order to avoid contractor delays or <br /> • unauthorized work. <br /> • Construction Administration Services: SGM can provide a full range of construction administration services. Our <br /> ® role will not involve instructing or directing the Contractor as to the means or methods of his construction <br /> techniques, but will involve enough supervision to ensure that the Contractor completes the project in reasonable <br /> o conformity with the plans and specifications. SGM believes that the firm providing the design is the most qualified <br /> o to provide construction inspection. Our experience in following tasks has made us a successful firm to protect the <br /> client's best interest in terms of completion on time and within budget, such as: <br /> • • Coordination with City's PM throughout the course of the project. <br /> • Responding to City's permitting department, building inspector, fire rescue,/fire marshal in a timely manner <br /> • to make sure that required data/& information are given in a timely manner without any delay. <br /> • • Review and respond to submittals, shop drawings and any RFIs in a timely manner. <br /> • On-site inspections by our engineers to make sure that all projects have been constructed per construction <br /> o documents, Florida Building Code and AHJ. <br /> o • All the warranty booklets, owner's manuals, as-build drawings and final close-out documents will be done <br /> on schedule. <br /> • <br /> Permitting: Permit applications will be prepared and submitted to the appropriate permitting agency. It is important <br /> • for the Owner to have permits in-hand prior to the bidding of a project in order to avoid contractor delays or <br /> • unauthorized work. <br /> o SGM Engineering will provide assistance to the City's Project Manager during the bidding procurement <br /> ® process. This will include: <br /> • Developing the Technical Specifications. <br /> • • Coordinate the City's Purchasing & Contracts. <br /> ® • Respond and resolve to any comments issued by City's Purchasing & Contracts. <br /> • Attend the pre-bid conference, assist the City Project Manager to respond and resolve to the <br /> • comments raised by Bidders/Contractors. Evaluate the Bidders and assist selecting the Bidder who <br /> complies with Specs & general requirements. <br /> o • Attend the Construction Kick-Off meeting, regular job site construction meeting, review the shop <br /> o drawings, owner's operational manual, submittals and pay applications. This will ensure the quality of <br /> equipment and the workmanship associated with the project. <br /> • • A complete Test & Balance of all DX units, Air or Water Cooled chillers, diffusers, Fans and Hydronic <br /> ® devices. This will ensure the Contractor's compliance to the Construction Documents. <br /> • An Energy Conservation measure to save electricity during unoccupied hours. This can be done by <br /> o using a simple time clock or an Energy Management System, per City's approval. <br /> o Project Approach <br /> o Our design team will ensure that there will be documented and constant communication with the City of Sunny Isles <br /> Beach and our design team. We will involve the facility end users and City personnel throughout the entire design <br /> o process. <br /> • Our approach starts with: <br /> • 1. Project Kick-Off meeting with all the parties involved, <br /> 2. Receive inputs during kick-off meeting regarding the nature of the project, <br /> • 3. Budgeting, compliance with UFC or other authority having jurisdiction over the project, <br /> • 4. Define the Project: Scope, Schedule, and Contract Documents, <br /> 5. Data Collection: Application of Anti-Terrorist/Force Protection criteria, <br /> • 6. Cost engineering, <br /> 7. Sustainable design utilizing LEED rating tools, <br /> • 8. Energy Conservation, <br /> • SGM /\ <br /> oENGINEERING!mirC0,5t1t11,4 as 49 <br /> 0 <br />