Laserfiche WebLink
• <br /> • <br /> • <br /> • , <br /> • _ <br /> • <br /> • "Dedicated to Excellence <br /> • People Serving People" <br /> • <br /> • Consultant's Evaluation <br /> • <br /> Date: 9-22-2009 <br /> • Attn: SGM Engineering, Inc. <br /> 935 Lake Baldwin Lane <br /> • Orlando, FL 32814 <br /> • Subject: Panama City Marina Civic Center Fire Protection <br /> 0 <br /> Original Consultant Contract Amount $45,000.00 <br /> • Final Contract Amount $45,000.00 <br /> ® Start Date 01-24-2008 <br /> • Contract Completion Date including extensions 11-30-2009 <br /> Projected Substantial Completion Date of Construction 11-30-2009 <br /> ® Scope of Work: Design and limited Contraction Administration related to the fire prevention <br /> improvement project which extended sprinkler protection to the auditorium and lobby of a 2000 seat theater. <br /> • <br /> Evaluation: Consultant designed and prepared construction documents related to the above scope of work. <br /> • When original bids came in above City budget the project was broken into two construction phases. Both <br /> ® phases were subsequently awarded, are under construction and near completion. No problems were <br /> encountered with the design and change orders were minor and within expectations. The Consultant performed <br /> ® all the tasks required in his contract. Overall The City is pleased with the services provided and would not <br /> hesitate to recommend the firm to others. <br /> Call if you have any questions. <br /> /lam®�'.��_\_1 <br /> • �� <br /> Mike Kazunas, City Engineer <br /> • 850-872-3015 <br /> • <br /> • <br /> • <br /> • City of Panama City Public Works Department <br /> P.O.Box 1880(32402-1880):9 Harrison Avenue. Room 206(32401) <br /> • Panama City.Florida <br /> (850)872-3015.(850)872-3077 fax <br /> • publicworks@cityofpanamacity.com(e-mail) <br /> 0 <br /> • 61 <br />