Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Raul Carreras <br /> • Project Designer <br /> • <br /> • Professional Design Experience <br /> • 7 R • Mr. Carreras has over 22 years of experience in the field of architecture with specialization in <br /> r • 'r program management,project team and consultant coordination,and production of construction <br /> • ; documents. As a project manager, Mr. Carreras collaborates on a variety of public and private <br /> • M sector projects including government facilities, park and recreational complexes and hospitality/ <br /> • commerical properties. <br /> • <br /> • MUNICIPAL EXPERIENCE <br /> • � }� Morgan Levy (formerly Doral Park) Park & Community Center, Doral, Florida - Project Manager <br /> responsible for Design Development,Construction Documents,Permit Procurement and Construction <br /> • Administration of three distinct design schemes for the renovation of this 1 4-acre Park.In designing the <br /> • renovations,an active and passive community center was developed,working within the confines <br /> • of the existing site layout which included tennis courts,a recreation building and a parking lot. <br /> • EDUCATION Joseph Caleb Center New Courthouse Annex/Additions and New Parking Garage, Miami, Florida <br /> • Bachelor of Architecture, - Project Manager. Services are to identify green building strategies for Miami-Dade County's new <br /> • University of Miami,2001 two-story Courthouse, three-story parking garage and retail located at the Caleb Community <br /> • Center. Once completed, BSA will seek Silver certification. at a minimum, under the LEED Green <br /> Building Rating System of the U.S. Green Building Council New Construction. Mr. Correras and the <br /> • Team conducted LEED feasibility report analysis during schematic design and organized chorette <br /> • sessions. The new two story courthouse has approximately 39.000 SF of public, semi-public spaces <br /> • and private.The new three story parking garage will contain 475 parking spaces and approximately <br /> 190,000 SF of constructed area to accommodate parking booths,control gates and approximately <br /> • 20 private spaces on the ground floor area. <br /> • <br /> • Palmetto Bay Park,Village of Palmetto Bay,Florida-Project Manager during/responsible for Design <br /> Development, Construction Documents. Permit Procurement, Construction Administration for the <br /> • development of this property for the new municipality consisting of five parks: three will require <br /> • upgrades while two others will require comprehensive landscaping, facility and function designs: <br /> • 45-acre Coral Reef Park especially captures the character of the community while addressing the <br /> needs of the village residents and surrounding neighborhood. <br /> • <br /> • Wayside Park,Village of Palmetto Bay, Florida-Project Manager responsible for Schematic Design <br /> • and Design Development for this 3-acre dog-oriented family park where"all"members of the family, <br /> including the family dogs con relax and enjoy the park atmosphere. The newly-enhanced facility <br /> • features separate areas for small and large dogs with an attractive gazebo,new pork furniture,and <br /> • a large lake with a beautiful fountain in the center. <br /> O City Hall Feasibility Study, Village of Palmetto Bay, Florida - Responsible for the preliminary needs <br /> assessment study that was done for the Villoge of Palmetto Boy.The vernacular style of the building <br /> • relates to the surrounding area where the facility is located.The two story mass is celebrated with a <br /> • four story tower which is crowned with a look out terrace. <br /> • City of Miami South District Police Substation, Miami, Florida'- Complete programming, master <br /> • planning, architectural, interior design and engineering services for the design of a 17,000 sq. ft. <br /> • district police substation, including spaces for front desk operations, administration, community <br /> • relations,crime analysis,interviewing,patrol,and vice plus on-site parking for 100 cars. <br /> • HOSPITALITY/COMMERCIAL EXPERIENCE <br /> • Embassy Suites Hotel,Miami,Florida-Project Manager for the design of this 39-Story Downtown Miami <br /> • hotel within the resurging Brickell Financial District. The project was developed to accommodate <br /> 251 guest suites and provides 3 floors dedicated to guest amenities including a private guest dining <br /> • area and marketplace shop,conference and meeting rooms,banquet rooms.as well as an outdoor <br /> • pool deck with adjacent day-spa,fitness gym and bar/lounge. The amenity floors have been linked <br /> • <br /> Cj D www.bermelloojamil.com <br /> • <br /> • 47 <br />