Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • _ Saul Suarez, RA <br /> • Quality Assurance & Quality Control <br /> • <br /> • engineered to post-tension slab,which helped meet the 512 million construction budget. <br /> • Nobel Point, Pompano Beach, Florida - Master Site Planner, Co-Architectural Designer and Project <br /> Manager of this marineoriented.99-unit development on a 5.5-acre site.All units had direct water <br /> • view and private docks,plus covered parking spaces, tennis courts and clubhouse, pool, meeting <br /> • rooms and exercise facilities.Construction budget of$10.2 million was aggressively pursued by the <br /> • client and provided by the design/build team. <br /> • Orange Blossom Adult Congregate Living Facilities, Pembroke Park, Florida -Master Site Planner as <br /> • port of a zoning change proposal to the City of Pembroke Park.This 220-room,two-story institutional <br /> • project was required to maintain a family character. The 88,000-sf facility, a design/build project, <br /> • was on budget at$3.7 million. <br /> • WASTEWATER TREATMENT PLANTS <br /> • South Dade Wastewater Treatment Plant, South Dade, Florida - Project Manager for this two-story, <br /> • 17,000-sf centrifuge facility.This facility was designed to house all equipment necessary to operate <br /> the centrifuge dewatering system for the SDWWTP. <br /> • <br /> • Plantation East Wastewater Treatment Plant, Plantation, Florida-Project Manager for responsible for <br /> • architectural design of this one-story. 12,003-sf industrial building.This facility wos used to house all <br /> industrial equipment necessary to operate the treatment process. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> Cb www.bermelloajamil.com <br /> • <br /> • 58 <br />