My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Manuel Synalovski Assoc., LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Manuel Synalovski Assoc., LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:14:23 PM
Creation date
2/10/2016 3:03:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • F <br /> • _1 <br /> • .a <br /> • <br /> MANUEL SYNALOVSKI ASSOCIATES (MSA)and our team of consultants have extensive <br /> • <br /> experience in the delivery of municipal and educational projects in the State of Florida, inclusive of <br /> • I Municipal, Recreational and Historical Projects. <br /> ® Key to the success of any project is the establishment of the duties at hand and identifying whom will <br /> be responsible for each activity. Our experience has proven that uncompromised communication and <br /> • a clear decision making process will assure an amazing project is completed for the City of Sunny Isles <br /> • Beach. <br /> ® MSA looks forward to adding another City of Sunny Isles Beach project to our municipal client list of <br /> over thirty Florida municipalities. We understand the needs and priorities of the municipal client ex- <br /> • tremely well. <br /> ® From day one it will be established that all communication between the City of Sunny Isles Beach will <br /> ® happen through Merrill Romanik, AIA, LEED AP, Project Manager from MSA. Merrill has been with the <br /> • firm for over twenty(20)years and has focused her attention on the public sector. She will be <br /> ® responsible of all communication to the architectural staff and the design team of consultants. This <br /> • proven system insures that communication and accountability is always maintained. <br /> • Here is how it works! <br /> • <br /> ® GATHER. Our services begin with data collection. It is important that all stake holders are part of <br /> the process so that any existing drawings, code compliance issues, relevant building maintenance <br /> ® <br /> information, pre-existing conditions, historical requirements, structural reports, systems and <br /> • infrastructure evaluation, asbestos reports, project budget, time constraints, etal. are identified and <br /> • shared with the team at the beginning of the project. The existing facility analysis will play a role in <br /> ® the building programming phase, since the facilities opportunities and limitations will be understood <br /> as early as possible. <br /> • PROGRAM. Our services continue with consultations with the City of Sunny Isles Beach staff to brain- <br /> • storm regarding the programmatic needs, priorities and essential adjacencies. The information shared <br /> will be documented in a written matrix that includes the space typology necessary, area requirements, <br /> ® <br /> equipment requirements, technology needs, finish and material evaluations, mechanical, electrical <br /> • and plumbing needs and identifying significant relationships and hierarchy of the spaces. <br /> • SKETCH. Next MSA will assimilate the information on the existing structure and the desired <br /> • programmatic needs into floor plan sketches that will be shared with the team for review and <br /> • evaluation. Commentary will be addressed and adjustments will be made to the plans so that all <br /> • stakeholders will be satisfied with the approach prior to proceeding with the construction documents <br /> • process. In addition, an opinion of probable cost will be provided so that we all may confirm that the <br /> project is achievable within the budget. Should the project be out of alignment in relationship to the <br /> • budget, now would be the time to have the discussions with the entire team, including our team of <br /> • design consultants, about modifying the approach, evaluating the proposed systems, reducing scope, <br /> • and evaluating alternate materials, equipment and systems. <br /> ® <br /> RFQ # 12-04-02 22 <br /> MANUEI SYNALOVSKI ASSOCIATES,LL( <br /> • ..rnan. wnmrTAKE•pLamnq <br /> u <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.