My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Manuel Synalovski Assoc., LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Manuel Synalovski Assoc., LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:14:23 PM
Creation date
2/10/2016 3:03:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> •• ; <br /> • <br /> DEVELOP. Once the initial program and project requirements have been established and funding <br /> • has been confirmed, the team will continue to develop the design and will insure that the most cost <br /> • : effective sustainable project is emerging. Throughout this effort, bi-weekly meeting will take place, <br /> • " and all key personnel will remain involved in the process. And initiate the agency review processes <br /> which may include a site plan approval process, a historical board review, engineering permitting, etc. <br /> • MSA will furnish all necessary documents to apply for and secure regulatory permits. Although LEED <br /> • certification is not specific criteria identified for the project, MSA will at a minimum introduce <br /> • sustainable strategies at this time. Introducing low in initial investment that provide responsible, <br /> • appropriate and money wise benefit to the City of Sunny Isles Beach and the community will be easily <br /> accomplished. Should the City require LEED certification, MSA is capable and proven with the USGBC <br /> • process and has four completed projects that are LEED certified (Lauderhill Municipal Complex - LEED <br /> • NC Silver, Children's Services Council - LEED NC Silver, Dania Beach Paul DeMaio Branch Library- LEED <br /> • NC Gold and Toyota Lexus Service Training Facility- LEED Gold). <br /> • At the end of design development, a progress set of plans and an updated opinion of probable cost <br /> • will be issued to the City of Sunny Isles Beach for review and evaluation. <br /> • DOCUMENT. Upon receipt of the City's review of the design development plans, MSA will <br /> commence with the completion of the construction documents. Architectural, Civil Engineering, <br /> • Landscape Architecture, Structural Engineering, Mechanical Engineering, Electrical Engineering, <br /> • Plumbing Engineering and Fire Protection Engineering plans (where applicable)will be created and <br /> • Code compliant detailed plans, sections, details, schedules, and specifications will be provided. <br /> • Where applicable, Interior Designers on staff at MSA, color selections and material finishes options will <br /> • be reviewed with the City of Sunny Isles Beach and final choices will be incorporated into the plans so <br /> • that the permit/bid documents are comprehensive and inclusive. <br /> • PERMIT. MSA will prepare the permit documentation for submission to the relevant Building <br /> • Department. In advance of official submission to the Building Department, MSA would request that <br /> • during the development of the project we schedule an appointment with the Building Officials to <br /> • review the project scope and walk through the Code requirements with them, so that they too are part <br /> of the process and there are no surprise interpretations from the authorities having jurisdiction late in the <br /> • game. <br /> • <br /> • Once submitted, MSA will monitor the progress of the reviews and upon receipt of any commentary for <br /> the plan reviewers MSA and the design team will address the questions promptly and thoroughly. We <br /> • <br /> will recommend scheduling a meeting with the Building Officials when we are ready to resubmit so that <br /> • we may review in person our responses and any remaining questions may be identified and solved on <br /> • the spot. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • RFQ # 12-04-02 23 <br /> MANUEL SYNALOVSKI ASSOCIATES,LLC <br /> • ..rw.ai:•r r r c.lt,•pLmmg <br /> • <br /> • — <br />
The URL can be used to link to this page
Your browser does not support the video tag.