My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Manuel Synalovski Assoc., LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Manuel Synalovski Assoc., LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:14:23 PM
Creation date
2/10/2016 3:03:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• €' <br /> • <br /> • <br /> • PRICE. MSA will assist the City of Sunny Isles Beach during the bidding of the project. We will work with <br /> • the City on determining the best method of bidding to pursue. We will prepare the bid documents that <br /> • <br /> • will be distributed, coordinate the bid process, respond to any requests for information during the <br /> bidding, analyze the bids received and provide the City of Sunny Isles Beach with the recommendation <br /> on the award of the construction contract. <br /> • <br /> • CONSTRUCT. Finally, we arrive at the construction phase of the project and our participation and <br /> • continued communication will be critical to the success of the building process. During the <br /> • construction, the design team will remain an active participant by attending the regular construction <br /> progress meetings and by performing the tasks identified below: <br /> • <br /> • <br /> • • Advise the City of Sunny Isles Beach on all aspects of the construction project. <br /> • • Review Shop Drawings and Submittals provided by the contractor. <br /> • <br /> • • Make periodic site visits to the project to observe the progress at <br /> • appropriate intervals in the progress of the work. <br /> • • Assure that a high level of workmanship is maintained and achieved. <br /> • <br /> 111 <br /> • Issue instructions to the contractor, should any interpretations and <br /> clarifications be required. <br /> • <br /> • • Review, evaluate and approve progress payments due based upon <br /> • the progress of the work completed. <br /> • • Observe the initial operation of the building systems and confirm <br /> • compliance with the specifications. <br /> • Perform a final punch list. <br /> • <br /> • • Report and establish final project completion, including recommending <br /> • final payment at the appropriate time and retainage reduction, if appropriate. <br /> • • Submit AutoCAD format record documents to the City of Sunny Isles Beach. <br /> • <br /> • <br /> • CELEBRATE. Lastly, we will celebrate with the City of Sunny Isles Beach at the opening or reopening of <br /> the project building site. The legacy of the project will live on for current and future residents to enjoy <br /> • for years to come. <br /> • <br /> • <br /> • <br /> • ' <br /> • RFQ # 12-04-02 24 �^ <br /> MAAR SYNAIOVSKI ASSOCIATES,TIC <br /> • u <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.