My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
BEA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 3:00:53 PM
Creation date
2/11/2016 3:00:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> • Qualifications <br /> • <br /> • Quality Control <br /> • We have in-house registered general contractors that provide quality control for constructability purposes.John Colao,AIA, GC and <br /> • Bruno Elias Ramos,AIA, NCARB, GC, LEED AP will lead the Quality Control efforts.They have more than 50 years of combined <br /> experience in the construction and architecture industries.They will be assisted by George Sainz,CBC who holds a Bachelors of <br /> • Architecture degree and is a Certified Building Contractor. All three participate at each stage of development reviewing the plans with <br /> • a focus on constructability and assessing design details focusing on minimizing water intrusion and maintenance and making sure <br /> • that the project will stand gracefully for many years to come. <br /> • Cost and Budget Control <br /> • At BEAArchitects,cost control and budget compliance is weaved into each design phase; it is an integral part of how we do business. <br /> From the outset of the project, architects work hand-in-hand with in-house cost estimators. Design alternatives and architectural com- <br /> • ponents are weighted for cost implications and schedule impacts. This is reinforced by our work method,which is based on compara- <br /> • tive analysis,whereby we generate several design alternatives that are compared to each other for cost, aesthetics, performance and <br /> • other implications. <br /> • We prepare in-house preliminary estimates of probable cost to cor- w a <br /> • roborate that the building is within budget.We also conduct project , a <br /> presentation meetings to the OR and Board. If LEED certification is <br /> • the goal.it is weaved into the project at this stage.We register the ` <br /> • project with the USGBC and prepare the preliminary checklist for <br /> y�. ' Yr `�<. nil-` <br /> certification.A series of meetings to discuss LEED are held,with the . sr r�, t- _ <br /> ® design presentations highlighting sustainable strategies for consider- -` - , v `' - <br /> • anon. n -' <br /> ® Meet or Exceed the Requirements of the RFQ4. . , �a - ., ^ <br /> • We believe BEA Architects, Inc. has demonstrated that it is extremely �a 4 n���=fit <br /> • qualified and experienced at providing Continuing Professional NE `.1L-1, i';+ <br /> • Services similar to those required by the city and our qualifications $ i . ;�q 0 i '"s <br /> as well as level of experience exceed minimum requirements of the 111 q� ._ w� : <br /> • RFQ for this acquisition. Oil ' -'1 Q�a- °e: *S <br /> • .,� <br /> t • ti <br /> • Within the body of this RFQ response, BEA has provided to the City t 11 i I u .111,914 n• 'ie -- m �_ - <br /> o• afCertificate of Isles Liabil ty Inies of sEA's urance ancce naming thnal e city as a Certificate <br /> nses and tion f 04 1 g ,� R a -- <br /> • Holder as well as resumes of the staff who will be working on Task ,. - -- �r <br /> Orders as well as numerous project sheets of relevant design worker t. <br /> that has been executed throughout Florida and beyond. n u z� - <br /> • r` - -, ;�. t <br /> • v:-."-) 1` --tri- --7 `� if <br /> • At BEA Architects,we look forward to a successful business and ;. y�. `� ,y <br /> • professional relationship with the City of Sunny Isles. �''° ,��`"' ^ a +�°.,`� ' <br /> • <br /> • <br /> • - L.1' <- p_- :: <br /> lt374 Jif 3 . Y 1 P , <br /> _ • <br /> • <br /> • f - q - 7� ©'r air a• <br /> • tx L 0 ®c- <br /> ` "fa <br /> • <br /> • <br /> HA Architects.Inc-RFQ:12-0.4-02 12 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.