Laserfiche WebLink
0 <br /> .` Jason ebber, Pow <br /> 7 Roadway Construction Coordination <br /> • Relevant Experience <br /> 0 Falkenburg Road and Progress Boulevard Extension, Hillsborough County, Special Qualifications <br /> O FL—Served as a design engineer on the Kimley-Horn team on this project that • Seven years of experience in the <br /> involved the addition of an eastbound left turn lane from the Lee Roy Selmon surveying industry <br /> ® Expressway Ramp to Falkenburg Road. Designed the stormwater management • Experienced with many aspects <br /> 0 system for the runoff caused by the construction of the turn lane. of civil design services, including <br /> site design, stormwater <br /> O Hayes Road Extension, Oldsmar, FL—Served as a design engineer for management and drainage <br /> design, sewage collection <br /> 0 the Kimley-Horn team that is working on the 1,800-foot urban collector road design,water distribution <br /> O extension within the City of Oldsmar. Project involves the design, alignment, systems, and agency permitting <br /> and permitting of the two-lane roadway that includes bicycle lanes and a multi- • Proficient with AutoCAD, Land <br /> ® <br /> use trail/sidewalk, as well as extensions of water, sanitary sewer, and reclaimed Desktop, Softdesk, Solidworks, <br /> • water down the new right-of-way. The project also involves extensive utility Sokkia total station,Topcon total <br /> coordination as a major section of the proposed roadway travels down the station, and Microsoft Office <br /> Progress Energy utility corridor. In addition, prepared the engineering report Professional Credentials <br /> 0 for a Southwest Florida Water Management District Environmental Resource Bachelor of Science, Civil <br /> 0 Permit modification. Responsible for construction observation, certifications, Engineering, Pennsylvania State <br /> O and closeout of the project upon completion of construction. University <br /> Professional Engineer in Florida <br /> • Barry University Master Plan, Miami Shores, FL— Serving as project analyst. <br /> • As a subconsultant to another firm, Kimley-Horn is providing utility and traffic Professional Organizations <br /> and transportation planning services at Barry University's Miami Shores , American Society of Civil <br /> • campus. For utility services, the KHA team has provided a compilation of the Engineers <br /> • utility information collected from Barry University staff via meeting and existing Florida Engineering Society <br /> plans; conducted an overall assessment of condition of the respective utility <br /> 0 based on the best information available; conducted an overall assessment <br /> • of condition and life expectancy of the respective utility based on information <br /> 0 received from the University; conducted an assessment of existing utilities <br /> (water, sanitary sewer, and drainage) to determine demands and required <br /> O improvements based on the 5-year and 20-year buildout of the campuses; <br /> O assisted in phasing and scheduling of utility improvements; and reviewed and <br /> 0 made recommendations of LEED®design characteristics for drainage services. <br /> Traffic and transportation planning services have included the review of <br /> 0 vehicular, pedestrian, golf cart and bicycle circulation, and a review of parking <br /> • requirements for the campus. <br /> 0 Broward College Campus-Wide Master Planning, Broward County, <br /> • FL— Served as project analyst. KHA provided utility planning services at ' <br /> Broward College Central, North, and downtown Fort Lauderdale campuses. <br /> 0 The KHA team has provided a compilation of the utility information collected <br /> O from Broward College staff via meetings and existing plans; conducted an <br /> 0 overall assessment of conditions and life expectancy of the respective utilities; <br /> assessed the existing utilities (water, sanitary sewer, and drainage) to determine <br /> 0 demands and required improvements based on the 5-year and 10-year buildout <br /> • of the campuses; assisted in phasing and scheduling of utility improvements; <br /> 0 and reviewed and made recommendations for LEED® enhancements. In <br /> addition, KHA provided an overall assessment of existing landscape materials, <br /> 0 <br /> 0 RFONo.12-04-02 Pr=^ Kimley-Horn <br /> • 07300014.12o sunny Nes ASE senices nesumes.4dd \=r I and Associates.Inc. <br /> 3-22 <br />