My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Assoc. - Transportation
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn and Assoc. - Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:12:03 PM
Creation date
2/11/2016 3:43:42 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • Jason Webber, P.E. <br /> • Relevant Experience cont. <br /> • provided recommendations for enhancements, and assisted in providing estimated costs and budgets for required <br /> • landscape improvements. We are also assisting in phasing and scheduling of landscape improvements. <br /> Florida Atlantic University (FAU) Florida Atlantic Boulevard Northern Four Lane Design and Permitting, <br /> • Boca Raton Campus, Boca Raton, FL—Served as lead design engineer for roadway design (including vertical <br /> • alignment, cross sections, pavement design, and grading), drainage design, reclaimed water main, utility relocation, <br /> and erosion and sedimentation control. Assisted the project manager with coordination with FAU, Palm Beach State <br /> College, the Research and Development Park at FAU, and the City of Boca Raton. Led design team coordination <br /> • with two subconsultants for three disciplines. Responsible for the South Florida Water Management District <br /> • (SFWMD) calculations for multiple basins and two analysis conditions. Coordinated with SFWMD to obtain the <br /> ® environmental resource permits with no comments. <br /> • Florida Atlantic University (FAU) Continuing Minor Civil Engineering (Multiple Projects), FL— Kimley-Horn <br /> is providing a variety of services for FAU at its multiple Florida campuses. Projects performed in conjunction <br /> ® <br /> with this contract include serving as project analyst on the FAU Boca Raton Campus Lee Street Sidewalk project <br /> • in Boca Raton. The project involved design and construction of 1,800 linear feet of 8-foot-wide sidewalk from <br /> ® the Engineering Building to the Recreation Center. The project included filling of existing adjacent swales and <br /> modification to existing SFWMD permits. Also served as project analyst on the FAU Harbor Branch Campus Entry <br /> • Road and Guardhouse Reconstruction project in Fort Pierce. KHA provided the design and permitting of the <br /> • pavement reconstruction of the entry road from US 1 to the Barrows Building at the Harbor Branch Campus. The <br /> • design included reconstruction of the roadway surrounding the guardhouse. Permitting for this project included <br /> SFWMD and the Florida East Coast Railway. Also involved with the improvements to NW 6th Avenue from NW 28th <br /> • Street to NW 32nd Street on the FAU Boca Raton Campus. <br /> • Florida Atlantic University (FAU) Harbor Branch Entry Road Modifications, Fort Pierce, FL— Design analyst <br /> • responsible for the civil design of the entry road modifications at the guard house entry to the Harbor Branch <br /> • campus. Responsible for layout, grading design, utility connections, and coordination with the Florida East Coast <br /> ® Railway. Aided the project manager in utility relocation coordination. <br /> ® Florida Atlantic University (FAU) Harbor Branch Oceanographic Institute (HBOI) Link Building Renovation, <br /> Fort Pierce, FL— Design analyst responsible for the civil design of the Link Building renovation as a subconsultant <br /> • to another firm. Responsible for layout of sidewalks, grading design, and coordination with the prime consultant. <br /> O Florida Atlantic University (FAU) Harbor Branch Campus Barrows Building, Fort Pierce, FL— Design analyst <br /> ® responsible for the civil design of the truck turnaround at the Barrows Building. Responsible for layout, grading <br /> • design, and aided with coordination with the contractor through construction. <br /> • Florida Atlantic University (FAU) Harbor Branch Oceanographic Institute (HBOI) Research Laboratory II, Fort <br /> ® Pierce, FL— Design analyst for the Kimley-Horn civil team that, as a subconsultant to another firm, provided site <br /> engineering for this building. Responsible for site layout, drainage design, utility relocation and design, and grading <br /> • design. Also aided project manager with permitting through SFWMD. <br /> Florida Atlantic University (FAU) Harbor Branch Campus Phase I Force Main, Fort Pierce, FL—Design analyst <br /> • responsible for the civil design of the Phase I force main connecting the Harbor Branch campus to the existing <br /> • force main at US 1. Responsible for layout, force main design, and roadway rehabilitation associated with the <br /> • connection between the two existing systems. <br /> • Florida Atlantic University (FAU) Harbor Branch Campus Phase II Force Main, Fort Pierce, FL— Design analyst <br /> responsible for the civil design of the Phase II force main connecting the Johnson House and proposed Lab II <br /> • areas to the interconnect. Responsible for layout, gravity system design from Johnson House to the proposed <br /> • Lift Station 7 at the Facilities Building, force main design from the proposed Lift Station 7 to the interconnect, and <br /> • roadway rehabilitation associated with the connection between the two existing systems. <br /> • <br /> R'-O No 12-04-02 1.- Kimley-Horn <br /> • 0Y3C001412o sway isles ASE Sentes reswnes.hdd \M/ I and Associates Inc <br /> 3-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.