Laserfiche WebLink
O Professional Category:CLlL ' b � ,, EE <br /> NMENTAL <br /> t` y , lg ,= ` <br /> • s: l�oa e J8ly ENGINEERING z® <br /> ® When Miami Lakes incorporated, they obtained the - <br /> ® responsibility and ownership of the roadway and drainage <br /> infrastructure within the Town limits. To assist with this effort, Leaminc:Hil:;411=1?:;:fre.-.. <br /> ; ,-�;i <br /> �� <br /> ® Kimley Horn provided support to assess the condition of the4 • <br /> existing infrastructure. ,r'"� e i. <br /> ® Kimley-Horn evaluated roads, sidewalks, signing, and _Ostriping within the Town limits. The recommendations from " -___;----.;_e'., - __ <br /> ® this assessment included a prioritization of the improvements 4 `a? __1 s1. i K:,+'� <br /> along with a five-year capital improvements program (CIP). u < y� <br /> ® To facilitate implementing these improvements, we provided <br /> o construction documents and obtained bids from contractors to <br /> ® implement the projects. <br /> ® To develop Miami Lakes' own stormwater utility, Kimley-Horn prepared a stormwater master plan that outlined <br /> ® the deficiencies of the current stormwater system. Additionally, we developed the stormwater utility fee <br /> methodology and established the range of rates for the utility to implement improvements. Kimley-Horn also <br /> ® prepared a five-year CIP for the stormwater improvements. Other achievements include obtaining a grant from <br /> ® the Metropolitan Planning Organization to prepare a Transportation Master Plan. This master plan provided <br /> ® Miami Lakes with recommendations to improve transportation circulation as well as pedestrian mobility. Specific <br /> roadway and drainage improvement projects that have been completed on time and under budget include: <br /> ® Miami Lakeway North Roadway and Drainage <br /> - ;-f+:r,l- ..�T,i_ <br /> Improvement Project. Roadway and drainage improvement <br /> "y ~ <br /> t .. l «_ project on Miami Lakeway North in the Town of Miami Lakes. <br /> ® l 1."‘"'-' :.\--7:::•':1!.::9...;;:,1-1-:',: ::+• ' �� ;2:4 The improvement project included roadway restoration, <br /> a nl '1� j.? 'Nnew curbing, new pavement markings, and new drainage <br /> z, infrastructure from Ludlum Road to Celebration Point <br /> ® 1-'r-4 �s ` development, and along NW 64th Avenue from Miami <br /> ® C' Lakeway North to the Biscayne Canal. The drainage design <br /> r• included the necessary stormwater modeling and permitting <br /> Bi for a new drainage outfall into the canal. In addition to the <br /> ® _ much needed stormwater improvements, several traffic and <br /> ® __ <br /> --'�� parking related improvements were included. Right- and left- <br /> turn lane extensions provided for additional queuing space, <br /> ® paved parallel parking was added in existing swale areas, <br /> • and a new parking lot was added in close proximity to the Miami Lakes Park tennis courts and Miami <br /> e Lakes Middle School portable classrooms. The enhancement project also included landscaping and <br /> irrigation improvements, as well as new lighting for the parking lot. Kimley-Horn provided construction <br /> ® phase services to expedite the project and confirm the project was built in compliance with the plans <br /> ® and specifications. As a result of the design, public involvement with the community, and coordination <br /> ® with the contractor, the construction process was very successful, impacts to the community were <br /> minimized, and the project came in on time and under budget. <br /> ® NW 154th Street Drainage Improvements. Roadway restoration/resurfacing and drainage <br /> improvements on a major roadway through the Town including a new drainage outfall, median <br /> ® <br /> improvements, irrigation system, and project permitting. The project schedule and maintenance of <br /> ® ==e No.12-04o2 r Kimley-Horn <br /> OY26001S.Ro Sunny Isles Cidl EnNronmen;al Eng.indd Mr , and Associates,Inc. <br /> 0 2-7 <br />