My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Assoc. - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn and Assoc. - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:10:07 PM
Creation date
2/11/2016 4:10:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® " I Professional Category; <br /> ®, � , CIVIL/ENVIRONMENTAL- <br /> N., <br /> �� ENGINEERING xrueo ,zoaoi <br /> e Defy <br /> e <br /> ® traffic was designed to minimize impacts to the Town and adjacent property owners. The majority <br /> e of the project was constructed at night to minimize impacts. Close coordination was required with <br /> Miami-Dade County Traffic Division and the Florida Department of Transportation. Construction phase <br /> ® services were provided to expedite the project and ensure the project was built in accordance with the <br /> ® design plans. <br /> ® y� �;, Lake Glenn Ellen and Lake Cynthia Roadway and <br /> ® - x, l :° • ;1 Drainage Improvement Project. Roadway restoration/ <br /> $'' 'g 4 ,.: `' - resurfacing and drainage improvements in a residential <br /> ® ; _ ab �• community including new drainage outfalls, permitting, signage, <br /> ® . ..-..,41-..,-4 �uF'` l,,,442:#' <br /> .1.-c" f'titr,• r�, and pavement markings. Our team located proposed drainage <br /> 9 P P 9 <br /> ��~ : t p__`'_"• 4i'S7.' 24• S infrastructure to minimize impacts to existingutilities with a <br /> --,-.17'; ' special emphasis on sanitary laterals for all adjacent homes. As <br /> ® - '' part of the project, special attention was required to protect the <br /> ® r — existing tree canopy and all public rights-of-way and driveway <br /> ® ,/7_�.—___t7 ==7F - aprons were restored to equal or better condition. The project <br /> ® - -4 also included close coordination with residential property <br /> 4 = owners and careful maintenance of traffic to minimize impacts <br /> ® to the community and maintain property access at all times. <br /> ® _ Loch Ness Roadway and Drainage Improvement Project. <br /> ® ;,a t' r "i -3--...- " `�s�" Roadway restoration/resurfacing and drainage improvements <br /> z -•.. i s 1 ! •� <br /> ® 17-:::74-g-.3- x m in a residential community including modifications to existing <br /> 1,i1-. 1., ; f' "L - "4- i ;S drainage outfalls permitting, signage, and pavement markings. <br /> fir^ s <br /> ® r4 , m:-I--..':..41 ;�; Our team located proposed drainage infrastructure to minimize <br /> 0 y *� •��',-qq impacts to existing utilities and adjacent properties. As part of <br /> _ whit �:;s};'1 kit 4 �_ hlivil the project, a new traffic circle and two pavement narrowing <br /> ® 1'- - i'— .� ��;-,',` `...r.40I devices were installed for residential traffic calming. A new park <br /> :C == <br /> ® <br /> :parr- <br /> i _ _ = facility was also installed after restoration of the staging area. <br /> ® lir' _� Special attention was required to restore all public rights-of-way <br /> .tet- r'---_ ....-..7_,....---...-t <br /> ® - = = • s., and driveway aprons to equal or better condition. The project <br /> also included close coordination with residential property <br /> ® owners and careful maintenance of traffic to minimize impacts <br /> ® to the community and maintain property access at all times. <br /> ® �. Lake Elizabeth Roadway and Drainage Improvement <br /> + 1„ t -*_." Project. Roadway restoration/resurfacing and drainage <br /> 0® � , - C- -<' 1 improvements in a residential community including new <br /> `` ! drainage outfalls and permitting. Our team located proposed <br /> ® L , <br /> t J , „f: drainage infrastructure to minimize impacts to existing utilities <br /> F c + t 1 'Ff n < e s'1 and adjacent properties. As part of the project, new park <br /> ® I t -i..7--?1,r;.Ag ==14 "° j facilities were installed after restoration of the staging area' l and coordination with residents was provided to implement <br /> — _,`_ sleeves for future median irrigation. The project also included <br /> ® y close coordination with residential property owners and careful <br /> = <br /> ® f maintenance of traffic to minimize impacts to the community. <br /> =. <br /> ® FQ No.12-04-02 Pr Kimley-Horn <br /> OY260015.12o Sunny Isles Crvil Enwomnental Eng odd 1.11..=I and Associates,Inc. <br /> 0 2-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.