My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Assoc. - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn and Assoc. - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:10:07 PM
Creation date
2/11/2016 4:10:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> I C© -1a v'p�" I Professional Category: <br /> .F 9 late <br /> � .:CIVIL/ENVIRONMENTAL. - <br /> 1 _ �� o tub r - ' ENGINEERING RaNa,22 <br /> 0 <br /> • NW 21st St. Improvements. Kimley- <br /> Horn is currently designing a drainage =r ------� <br /> system on NW 21st Street, from SR 7 to <br /> o .10/15.41"; <br /> .., <br /> • Willie Webb Park. The City plans to add i—D� w , 1'�1'' <br /> • bicycle and pedestrian facilities on this �� l7 -L_1 L, � t ,. <br /> • n r -yl ,ofiT if d <br /> • roadway segment; a profile correction �,� � Val s also intended for this segment. The 1 I ul ; . ,. ' <br /> 4;r 5l ar „ o <br /> ® new drainage system is needed to le r ti . - <� <br /> accommodate these new facilities. This 1 I i i 4 r , <br /> ® new system will drain into the City's j o; L f` =;' i <br /> ® canal system. i . = =-.._-__ _____ <br /> NW 41st St. Traffic Calming. The Ir __� _ <br /> 0 City plans to remove the existing speed aii- l 1—��.� <br /> • humps on NW 41st Street between SR - , "-_ <br /> • 7 and NW 31st Avenue. Without the _ I 51.11_? <br /> speed humps in place, speeding is — 1 :-) " C=❑ <br /> ® likely to be a concern. Kimley-Horn is <br /> • working with the City to install alternate <br /> • traffic calming measures. <br /> • Seacrest Neighborhood Improvement Program,Phase IV,Delray Beach,FL <br /> 9 Kimley-Horn prepared construction plans and specifications and provided bid phase services for Phase <br /> • IV of the Seacrest Neighborhood Improvement Program. The project included $1.5 million worth of <br /> improvements and upgrades to aging infrastructure on 18 streets within the existing Seacrest neighborhood. <br /> ® The improvements and upgrades included abandonment and relocation of existing two-inch water mains <br /> • and service connections, and installation of 3,000 linear feet of four-inch to eight-inch ductile iron potable <br /> • water distribution mains and service connections. We also designed and installed 360 linear feet of eight- <br /> inch ductile iron sanitary sewer mains with service connections, asphaltic concrete pavement overlays <br /> • and reconstructions, concrete sidewalks, traffic calming measures, stormwater drainage improvements, <br /> • retention ponds, driveway replacements, swale improvements, landscaping and irrigation, and associated <br /> • miscellaneous improvements. We also acquired all necessary permits from the Palm Beach County Health <br /> Department and South Florida Water Management District SFWMD. <br /> • <br /> • Industrial Avenue Corridor Stormwater n,..,,#: ' <br /> Improvements,Boynton Beach,FL :r ?:' <br /> fi- <br /> ® The firm completed the design of a large roadway and Y ' • <br /> drainage project serving approximately 23 acres of C7 Hi. 11-,1 tom- ;i_-_�. .,i.'_� <br /> 8 industrial land use and 49 acres of residential land use in r.,_,.._ - <br /> • Boynton Beach. The project was originally conceived by -,/ <br /> ® City staff to provide an outfall for the stormwater runoff ^ ' <br /> that accumulates along Industrial Avenue and along <br /> • Southwest 6th Street in Lake Boynton Estates. <br /> ® Kimley-Horn worked closely with City staff to modify their ®— :."L <br /> ® conceptual plan. The modification included substantial <br /> • <br /> 0 :SFO No.12-04-02 rI♦fl Kimley-Horn <br /> 0Y260015.12o Sunny Isles Civil Environmental Eng.inod and Associates,Inc. <br /> • 2-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.