Laserfiche WebLink
®I CO o r� -q' Professional Category: <br /> `' b1 - — a ENVIRONMENTAL <br /> 7 -, CIVIL/ <br /> ®l tem= P Dip°- `p ENGINEERING RFallo.122 <br /> 0 <br /> • use of roadside swales along Industrial Avenue to capture and contain stormwater runoff before discharging <br /> ® through stormwater inlets into large exfiltration trenches. The drainage was then routed into two detention <br /> ponds for additional storage and treatment prior to discharging into an existing FDOT ditch. Kimley-Horn also <br /> O designed an extensive roadside swale system throughout Lake Boynton Estates to maximize the capture <br /> d and percolation of stormwater runoff from this residential area. Additional stormwater inlets were included to <br /> capture and convey overflow from the residential swale system into the second detention pond. Kimley-Horn <br /> also designed improvements to the FDOT ditch that conveys treated stormwater from the second detention <br /> • pond to the Lake Worth Drainage District's E-4 canal. <br /> ® Streetscape and Drainage Improvements for _ <br /> • Boynton Beach CRA,Boynton Beach,FL ij' �t f 4 z '+ 1 I � a:70A :e".r <br /> • 4 • U, r' ' 1 A .y,"91 yp <br /> ® Burkhardt Construction and Kimley-Horn are currently 1 ., a <br /> ® serving the City of Boynton Beach CRA for a boardwalk/ L T. Ci. 1 .1..'c 4. - It <br /> B streetscape project along the Intracoastal Waterway �� j ,k r € ,734"r. _a t� s:CIO <br /> �" <br /> involving the extension of Boynton Beach Boulevard. This J' p r! `4Z F j:• ° Y <-,: .t ,,' • <br /> ® is a part of a redevelopment effort by the Community t"' r a 'I c <.• <br /> � G ^-•t-,� 'a, r <br /> ® Redevelopment Agency to improve the city's waterfront. Al, } e"- ' ,r s f�/E , <br /> II The project consists of two specific elements: the extension z. a ;: <br /> 4- A' ` <br /> of Boynton Beach Boulevard from US 1 to the Intracoastal ` , i .;; '_ , , 5� __ :3=- <br /> ® Waterway and the construction of a boardwalk along the i a ti w�— <br /> ® Intracoastal Waterway from Boynton Beach Boulevard �� - 'j <br /> north for approximately 4,000 feet. Unique aspects of the — =-- <br /> • project include extensive environmental permitting, utility <br /> ® coordination for future development, and traffic calming <br /> ® measures. Included in the scope of work was the design of the roadway, utilities including water, sewer, <br /> drainage, and electric, the layout and design of a 500-foot promenade/boardwalk, and 1,300 feet of Riverwalk <br /> • along the Intracoastal. The project is now completed and open to the public. <br /> 0 <br /> Hypoluxo Road East of Lyons Road to --- <br /> Hagen Ranch Road,Lake Worth,FL Hypoluxo Road East"Yon Real""'"'Hagen"' '"m' <br /> ® Kimley-Horn designed the improvements for eR I ` '» t; -„'a' <br /> ® three miles of Hypoluxo Road from just east - - f .,r - G� 1 tv'Y <br /> of SR 7 to Hagen Ranch Road. This included ti'` : ae ' � 1 ,,, <br /> ® widening from two to four lanes as well as a 1 <br /> -•-•-- ,,,::::;„.,-'1' %:, '4. ,f-g { a" � J <br /> ® new four-lane segment with a new bridge over } � ltr . <br /> pclosely r: . N. '{ i��,w +•. r kik , it: <br /> 7k <br /> Florida Turnpike. We coordinated 7,, <br /> ® and permitted the bridge crossing from the • ow al , <br /> Turnpike as well as Lake Worth Drainage ;' , 1 :•-i .,:12-4,....2111_,*---.-A ' �'f g v} -_ , <br /> ® District (LWDD) due to the bridge crossing s q r ' i s 4 f ,- 2 - 5 <br /> • over two of their canals. We performed — ,_ - — --.. r�J �t &,-, . L}"- .,-�` <br /> stormwater management analyses for manyof ? r' = —�—- c•-!--7:,U- ` 5 ct ;-: <br /> 8 the existing developments along the corridor f; f . 'i 2 '`a_ - <br /> t= <br /> x tr rte:"=r. , iari� <br /> ® which received runoff from the project. We •,- -i 014.::? ,iN, -S{ !'nv IIIA t ; l( .nre; <br /> ® also designed two mast arm signals. <br /> 0 <br /> 0 <br /> REO No.12-04-02 pir mn Kimley-Horn <br /> lit 0Y260015 12o Sunny Isles Coil Enwonmental Eng mold `IIM r 1 and Associates,Inc, <br /> • 2-15 <br />