|
• j
<br /> Russell Barn- es----P.E
<br /> •
<br /> ) Principal-in-Charge
<br /> ® Representative Experience Special Qualifications
<br /> 0
<br /> General Civil Engineering Consultant, Bay Harbor Islands, FL— Served as • Has 24 years of civil
<br /> ® project manager for this general services contract. Recently completed the engineering experience
<br /> i® master plan for a community enhancement program that includes roadway, • Civil engineering
<br /> ® streetscape, drainage, utility undergrounding, and beautification. Construction experience includes
<br /> documents are currently being prepared for the community enhancements. transportation, roadway
<br /> ® Additional projects that are currently under construction, or have recently been design, sanitary sewer
<br /> ® constructed, are two passive parks and a roadway beautification project. Half studies and design,
<br /> ® of the cost of these projects was funded by a grant obtained with Kimley-Horn's corridor location
<br /> assistance. studies, drainage, and
<br /> ® intersection design
<br /> ® General Consulting Services and Stormwater Master Plan, Palmetto Bay, FL Serves numerous South
<br /> Served as project manager for the development of a Stormwater Master Plan for •
<br /> • the Village of Palmetto Bay to address flood protection activities for its residents, Florida municipalities,
<br /> as well as protecting the environmental quality of its many canals. Also including the cities of
<br /> ® developed a Stormwater Management Report to assist the Village in creating Miami, Miami Beach,
<br /> • a stormwater utility. The project tasks primarily consisted of data compilation, Miami Lakes, South
<br /> • development of a Stormwater Master Plan, development of a Stormwater Miami, and the Town of
<br /> Management Report, and assisting the Village in joining the National Flood Bay Harbor Islands
<br /> • Insurance Program (NFIP). Professional Credentials
<br /> ® Town Engineering Services, Miami Lakes, FL— Project manager who served Bachelor of Science, Civil
<br /> the Town of Miami Lakes as their initial Town Engineer. Miami Lakes has Engineering, North Carolina
<br /> ® contracted with our firm to provide all aspects of engineering associated with State University
<br /> ® the Town. Kimley-Horn provided support in a wide range of areas to assess Professional Engineer in
<br /> ® the conditions of the existing infrastructure. Provided Miami Lakes with an Florida
<br /> assessment of the conditions of the roads, sidewalks, signing, and striping Plans Preparation
<br /> Workshop,within the Town limits. The recommendations from this assessment included a Florida
<br /> ® prioritization of the improvements, along with a five-year capital improvements Engineering Society
<br /> program (CIP). To facilitate implementing these improvements, we provided
<br /> ® construction documents and obtained bids from contractors to implement the Focus on Business
<br /> ® projects. Other achievements include obtaining a grant from the Metropolitan '90, Florida Institute of
<br /> ® Planning Organization to prepare a Transportation Master Plan. This master Consulting Engineers
<br /> plan will provide Miami Lakes with recommendations to improve transportation Kimley-Horn and
<br /> • circulation, as well as pedestrian mobility. Associates, Inc. Leadership
<br /> Miami Lakeway North, Miami Lakes, FL— Project manager. Kimley-Horn Program
<br /> ® developed construction documents for roadway and drainage improvements Professional Organizations
<br /> ® on Miami Lakeway North in the Town of Miami Lakes. The improvement project
<br /> included roadway restoration, new curbing, new pavement marking, and new American Society of Civil
<br /> • drainage infrastructure from Ludlum Road to the Celebration Point development, Engineers (ASCE)
<br /> ® and along NW 64th Avenue from Miami Lakeway North to the Biscayne Institute of Transportation
<br /> ® Canal. The drainage design included the necessary stormwater modeling Engineers (ITE)
<br /> ® and permitting for a new drainage outfall into the canal. Kimley-Horn provided
<br /> construction phase services to expedite the project and ensure the project was
<br /> ® built in compliance with the plans and specifications. As a result of the design,
<br /> ® public involvement with the community, and coordination with the contractor,
<br /> the construction process was very successful, impacts to the community were
<br /> ® minimized, and the project was completed on time and under budget. =r1 Kimley-Horn
<br /> \ and Associates,Inc.
<br /> ®
<br /> PIC No.12-04-02 3-5
<br /> 0Y26C015.12o Sunny Isles G9 Ern4omneral Eng Resumes ido
<br />
|