Laserfiche WebLink
• Russell Barnes, P.E. <br /> ® Page 2 <br /> ® Representative Experience (continued) <br /> ® North Shore Area Roadway Improvements, Miami Beach, FL—Served as manager for the utility work and <br /> ® the sanitary sewer inflow/infiltration investigation on this urban streetscape improvement project in the North <br /> ® Shore area of Miami Beach. The firm was successful in obtaining over $8 million in county and state funding <br /> in addition to a $1.6 million ISTEA grant through the Metropolitan Planning Organization for development of a <br /> I® 1.5-mile bicycle/pedestrian corridor along the oceanfront. <br /> ® Sanitary Sewer Flow Capacity Study (East Island), Bay Harbor Islands, FL—As project engineer, performed flow <br /> ® capacity analysis of gravity sewer system to determine system deficiencies and identify needed improvements. <br /> ® This study determined the existing capacity of the system, as well as the capacity after expected development. <br /> Performed an impact fee analysis to determine the sewer impact fee for future development. <br /> ® <br /> Town of Bay Harbor Islands Community Enhancement Master Plan, Bay Harbor Islands, FL—As project <br /> manager, oversaw efforts to develop a comprehensive community enhancement program for the entire town. <br /> ® Key to the development of the program was the identification of the appropriate cross-section for the Town's <br /> ® residential streets. Of central concern to Town residents was the calming of local traffic, the inclusion of bicycle <br /> ® accommodations, on-street parking, and a typical section that provided a landscaped area separating the <br /> sidewalk from driving lanes. The use of computer-enhanced images was a powerful tool in communicating <br /> • various options to area residents, and were highly effective in helping the Town and the neighborhood to <br /> ® identify the solution which best fit their needs. Performed a variety of services to develop a vision for the initial <br /> phase of the Community Enhancement Master Plan including: conducting a series of public workshops to <br /> ® identify the needs of the residents; reaching agreement on minimizing roadway cross-sections in support of <br /> ® narrowing the street to calm local traffic and permit the use of landscaped areas that separate private property <br /> ® from the travel lanes; discussing cost alternatives and phasing opportunities that would provide maximum <br /> flexibility in project implementation resulting from limited funding sources; and presenting options for <br /> ® neighborhood entry design that serves to reinforce neighborhood identity, enhance security, and calm traffic. <br /> ® Town of Bay Harbor Islands Business District Revitalization, Bay Harbor Islands, FL— Served as project <br /> • manager for this community enhancement program which included design and permitting services, roadway <br /> ® improvements, stormwater management, stormwater treatment, and a stormwater pump station. <br /> ® Citywide Wastewater Inflow/Infiltration Study and Mitigation Program, Miami Beach, FL— Project manager <br /> ® for the 150-mile citywide sewer evaluation and trenchless method rehabilitation design project. This highly <br /> successful program employed a multi-phased approach beginning with broad program development and <br /> ® <br /> proceeding with successively narrowing targets of further study, resulting in reconstruction of only those <br /> ® portions of the sanitary system that would provide substantial, cost-effective Ill elimination. The initial study <br /> ® identified 8 MGD of infiltration into the system. Subsequent phases involved identifying the sources of the <br /> I/I, designing corrective rehabilitations, and providing oversight of the construction. By working closely with <br /> ® rehabilitation contractors, Kimley-Horn was able to obtain some of the lowest per-unit costs in the country. <br /> ® Also developed the concept and application for a South Florida Water Management District grant for the City <br /> ® of Miami Beach, and have secured $50 million in bond financing. The program was structured so that the <br /> savings in treatment costs would fully pay the debt services on the bonds. <br /> ® Street Closure (West Island), Bay Harbor Islands, FL— Project manager working extensively with the Town <br /> of Bay Harbor Islands and the FDOT to develop landscaped road closures that form a regal gateway from <br /> I® the west complementing the eastern gateway. The permanent landscaped road closures were designed <br /> ® to improve safety and significantly enhance the roadways on the west island. Key to implementation of the <br /> project was our successful application for an FDOT Beautification Grant . The roadway was reconfigured to <br /> ® meet all FDOT standards. <br /> • <br /> ® RFo No 12-01-02 P�fl Kimley-Horn <br /> ® OY290015.12o Sunny Isles Crai-Emvonmerral Eng Resumes.indd \ and Agcnciates,Inc <br /> 3-6 <br />