My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Assoc. - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn and Assoc. - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:10:07 PM
Creation date
2/11/2016 4:10:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • Richard Tenn <br /> Page 2 <br /> • <br /> • Representative Experience (continued) <br /> • NPDES Stormwater Permit Dry Weather Field Screening, Miami, FL— Responsible for field testing of <br /> • environmental and physical parameters such as total dissolved solids, temperature, pH. Performed <br /> colorimetric analyses using CHEMetrics field test kits to measure chlorine, copper, phenols, and detergents. <br /> ® Conducted flow rate estimation and documented the presence of observed odors, such as chlorine, gasoline, <br /> • rotten eggs, and sewage. Collected, stored, and transported additional water samples in accordance with <br /> • established industry standards for the laboratory analyses. <br /> • MDX SR 874 Expressway Improvements, Miami-Dade County, FL— Developed stormwater drainage plans and <br /> 0 calculations for approximately six miles of expressway. The scope of work included the stormwater master <br /> plan report, environmental resource permit through SFWMD and stormwater modeling using AdICPR. <br /> ® Port of Miami Cargo Yards and Roadway Improvements, Miami-Dade County, FL— Developed stormwater <br /> paving, grading and drainage plans and calculations for various cargo yards and roadways within the Port of <br /> • Miami. <br /> • Tri-Rail, Miami-Dade County, FL— Involved the expansion of the Golden Glades Station for the Phase IV <br /> O double track improvements. Designed the stormwater drainage system for the new passenger platform at the <br /> • station. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> 0 <br /> • <br /> a <br /> 0• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> ® RFC No.12-00.-02 r fl Kimley-Horn <br /> ® OY260015.12m Suvry Isles Ciui Emirwumeral Erg Resumes indd \ r , and Associates,Inc. <br /> 3-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.