Laserfiche WebLink
Jorge: FernandezP.E = <br /> 'i) cgdEngineering, Utility/Environment-al Permitting, U(.,C jCeerdination <br /> , , <br /> ® Representative Experience Special Qualifications <br /> General Civil Engineering Consultant, Bay Harbor Islands, FL— Served as • Has eight years of <br /> ® project analyst and provided permitting assistance for this general services diverse civil engineering <br /> • contract. The Kimley-Horn team recently completed the master plan for analyst experience <br /> ® a community enhancement program that includes roadway, streetscape, • Areas of expertise include <br /> ® drainage, utility undergrounding, and beautification. Additional projects that are land development, <br /> currently under construction, or have recently been constructed, are two passive stormwater management, <br /> ® parks and a roadway beautification project. Half of the cost of these projects water and sewer <br /> ® was funded by a grant obtained with Kimley-Horn's assistance. systems, urban planning, <br /> ® system designexpediting,, <br /> ina,, andd <br /> City of Homestead Community Redevelopment - Southwest Neighborhood pexpegitility <br /> Plan, Homestead, FL—Served as project analyst and performed contaminant <br /> ® investigation, OPC, and master planning. The Southwest Neighborhood Master profiling <br /> • Plan is truly a first class work plan for all future development within the 350-acre • Experience serving <br /> historic African American neighborhood in the City of Homestead. Kimley- a diverse group of <br /> ® clients, including <br /> Horn led a diverse team of architects, economists, historians, planners, and <br /> ® specialists (including transportation, utilities, and environmental) to develop a counties, municipalities, <br /> • holistic approach to the redevelopment plan for the neighborhood. Through government agencies, <br /> ® a tremendous public consensus effort, the project has now become an and private developers <br /> amendment to the City land development code and is being implemented. • Proficient in AutoCAD <br /> ® and design analysis <br /> ® Miami River Greenway, Miami, FL— Project analyst involved in the creation software programs <br /> of a greenway within the existing right-of-way owned by the City of Miami. <br /> ® Responsibilities included permitting, drainage, site utility coordination and Professional Credentials <br /> • profiling, schematics, storm invert inspection, and survey verification. Our Bachelor of Science, <br /> team provided site civil services for paving, grading, landscape architecture, Civil Engineering, Florida <br /> ® construction plans, drainage plans, and permitting. The new Miami River International University <br /> ® Greenway will serve as a pedestrian linkage for the many communities along the <br /> river to the downtown. Professional Engineer in <br /> • Florida <br /> ® Midtown Miami Brownfield Redevelopment, Miami, FL— Provided utility profiling <br /> and coordination, permit scheduling, site inspection and calculations, water professional Organizations <br /> • and sewer design, Community Development District reports, drainage report American Society of Civil <br /> ® and exhibits, OPC, zoning approval, capital improvements, public right-of-way Engineers (ASCE) <br /> improvements, sight triangulation, environmental restoration analysis, shop <br /> ® drawing reviews for this large redevelopment project. American-Cuban Engineers <br /> ® <br /> (Miami) RiverFront, Miami, FL— Prepared the plans development submittal and <br /> provided utility coordination, site calculations, cross-sections, and paving and <br /> ® grading for this 11-acre site for a six-tower residential development. <br /> ® Bank of America (Coral Way and 147th Avenue, Bird Road and 152nd Avenue), <br /> • FL— Providing permitting, approval coordination, cut and fill analysis, public <br /> ® works plans, site utility study, and lift station calculations. <br /> o 3333 Biscayne, Miami, FL— Project manager responsible for the site civil <br /> ® elements of this 15-story office building. Kimley-Horn applied the following <br /> green/sustainable elements and practices: NC condensate for irrigation, <br /> ® pedestrian garden area, pervious pavers, quality/quantity drainage, domestic <br /> and landscape water use efficiency, building energy efficiency, waste reduction <br /> o I=r1 Kimley-Horn <br /> management, and an indoor environmental layout. =r 1 and Associates,Inc. <br /> ® RFO No.12-04-02 3-18 <br /> OY260015.120&n,y isles C i-Emtavneral Eng flesumeskdc <br />