My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Assoc. - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Kimley-Horn and Assoc.
>
Kimley-Horn and Assoc. - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 4:10:07 PM
Creation date
2/11/2016 4:10:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> -) Dawid-B.an�nle�ttt . P:E: LEER° AP <br /> O Stormwater Planning/De-sign Hydrologic Modeling <br /> ; 1 <br /> • Representative Experience Special Qualifications <br /> ® <br /> Roadway, Traffic, and Stormwater Engineering Services, Lauderdale Lakes, • Has 20 years of <br /> FL— Project manager for the Kimley-Horn team that is working with the City of experience serving <br /> o Lauderdale Lakes under a general services contract for roadway, traffic, and municipal, government, <br /> o stormwater improvements. To date, we have started several projects: and private clients <br /> is Experienced in civil <br /> • NW 29th St Traffic Calming. Anticipating increased through traffic on NW engineering, including <br /> o 29th Street resulting from the construction of the new Walmart on the west paving, drainage, water, <br /> side of SR 7, the City contracted with Kimley-Horn to implement traffic sewer, and roadway <br /> o calming measures at this location. We completed a conceptual traffic design, as well as parks <br /> • calming layout for the Lauderdale Lakes CRA that served as the basis for the design <br /> • new design. <br /> ■ FDOT-certified EEO, DBE, <br /> • NW 21st St Improvements. Kimley-Horn is currently designing a drainage and Payroll Compliance <br /> • system on NW 21st Street, from SR 7 to Willie Webb Park. The City plans for local area projects <br /> to add bicycle and pedestrian facilities on this roadway segment; a profile <br /> • correction is also intended for this segment. The new drainage system is Professional Credentials <br /> • needed to accommodate these new facilities. This new system will drain into Master of Science, Civil <br /> the City's canal system. Engineering, University of <br /> • Miami <br /> NW 41st Street Traffic Calming Improvements. Served as project manager <br /> ® for the preparation of conceptual designs through construction documents Bachelor of Science, <br /> ® and associated permits for the NW 41st Street Traffic Calming Improvements Architectural Engineering, <br /> • Project in the City of Lauderdale Lakes, Florida. The project consisted of University of Miami <br /> • surveying, civil engineering, landscaping, hardscaping and irrigation design, Professional Engineer in <br /> permitting, and construction services for a roundabout to be located at the Florida <br /> • intersection of NW 41st Street and NW 35th Avenue. The project included LEED Accredited <br /> o the installation of new drainage improvements, pavement renovations, Professional <br /> • signing and pavement markings, utility adjustments, and maintenance of FDOT Maintenance of <br /> traffic. The work was planned and completed with minimal disruptions to the Traffic FL <br /> • City during construction. Training, <br /> FDOT-certified EEO, DBE, <br /> • Town Engineering Services, Miami Lakes, FL— Kimley-Horn is currently serving and Payroll Compliance for <br /> o the Town of Miami Lakes as their Town Engineer. Miami Lakes has contracted local area projects <br /> • with our firm to provide all aspects of engineering associated with the Town, <br /> including providing staff to fill the positions of Public Works Director and professional Organizations <br /> • Stormwater Utility Director. Specific projects have included: Florida Engineering Society <br /> o Lake Elizabeth Drainage Improvements. Roadway restoration/resurfacing <br /> • and drainage improvements in a residential community including new <br /> • drainage outfalls and permitting. Our team located proposed drainage <br /> ® infrastructure to minimize impacts to existing utilities and adjacent <br /> properties. The project also included close coordination with residential <br /> • property owners and careful maintenance of traffic to minimize impacts to <br /> o the community. <br /> o Bid Pack 4 Water Main and Force Main Replacement, Oakland Park, FL— Project <br /> o manager for the preparation of construction documents and associated permits <br /> for the replacement of more than 27,000 linear feet of water main and force <br /> io ri♦n Kimley-Horn <br /> ® \ and Associates,Inc. <br /> RFC No.12-.134-02 3-20 <br /> 0Y260015.12o Sunny Isles CnN-Enwomnental Eng Resumes.'indd <br />
The URL can be used to link to this page
Your browser does not support the video tag.