Laserfiche WebLink
0 <br /> r • Tho nas--Whalen <br /> • Stor water Planning/Design <br /> Representative Experience Professional Credentials <br /> ® Barry University Master Plan, Miami Shores, FL— Serving as project designer. Bachelor of Science, <br /> ® As a subconsultant to Hanbury Evans Wright Vlattas + Company, Kimley-Horn Business Administration, <br /> ® is providing utility and traffic and transportation planning services at Barry Nova Southeastern <br /> ® University's Miami Shores campus. For utility services, the KHA team has University <br /> provided a compilation of the utility information collected from Barry University NSPS-ACSM Level III <br /> ® staff via meeting and existing plans; conducted an overall assessment of Certified Survey Technician <br /> ® condition of the respective utility based on the best information available; <br /> conducted an overall assessment of condition and life expectancy of the <br /> Professional Organizations <br /> respective utility based on information received from the University; conducted American Society of Civil <br /> ® an assessment of existing utilities (water, sanitary sewery and drainage) to Engineers (ASCE) <br /> determine demands and required improvements based on the 5-year and <br /> ® 20-year buildout of the campuses; assisted in phasing and scheduling of <br /> utility improvements; and reviewed and made recommendations of LEED® <br /> ® design characteristics for drainage services. Traffic and transportation planning <br /> ® services have included the review of vehicular, pedestrian, golf cart and bicycle <br /> circulation, and a review of parking requirements for the campus. <br /> ® Bid Pack 4 Water Main and Force Main Replacement, Oakland Park, FL <br /> Kimley-Horn provided professional services for the preparation of construction <br /> documents and associated permits for the replacement of more than 27,000 <br /> ® linear feet of water main and force main in the City of Oakland Park, Florida. <br /> The project consists of replacing existing water mains that have been identified <br /> as being substandard with respect to system pressures during fire flow. <br /> ® Services and meter boxes will be replaced to the property line on new water <br /> line installations and fire hydrants will be installed in residential and commercial <br /> areas. As part of this project, select portions of force main will be upsized within <br /> ® the City and will include the aerial crossing of the C-13 Canal closest to NW <br /> ® 31st Avenue. A critical function of this project is developing a route through <br /> the neighboring City of Lauderdale Lakes to provide the most efficient path for <br /> ® looping of the water main. In addition the work must be planned to minimize <br /> ® disruptions to the City during construction. <br /> ® School Board of Broward County Open-End Services for Landscape Architecture <br /> ® Services, Broward County, FL— Kimley-Horn has been serving the School <br /> ® Board of Broward County (SBBC) under an open ended services contract for <br /> landscape architecture services. Under the contract, our team has provided <br /> ® services at numerous K to 12 campuses across Broward County. Services <br /> included performing Phase I environmental site assessments for schools within <br /> the district that included Hawkes Bluff, Plantation, Plantation Park, Meadow <br /> 0 Brook, and Tropical Elementary Schools; Seminole Middle School; and Coconut <br /> ® Creek High School. Our office provided an inventory assessment of existing trees <br /> and irrigation needs for these schools. The information was then used by KHA to <br /> prepare conceptual landscaping plans, details and specifications for landscaping <br /> ® improvements. In addition, KHA performed various drainage analysis' and site <br /> ® circulation studies/plans for Gulfstream Middle and Dillard High Schools. KHA <br /> ® assisted the School Board through public involvement by presenting the Dillard <br /> High School project to a neighborhood association group where we presented <br /> ® <br /> graphics and answered technical questions about the project. r=y1 Kimley-Horn and Associates,Inc. <br /> 4.-Q No.12-04-02 3-24 <br /> 0Y260315.12o Sunny Isles Circ-Enwremzl Eng Resumes.indd <br />