® Mark -Mi�ljler,,RE
<br /> r>
<br /> r Water/Wastewater Utility/Pump Station Design,Hydrologic Modeling
<br /> Ll
<br /> O Representative Experience Special Qualifications
<br /> ®
<br /> Wastewater Treatment Facility Rehabilitation/Expansion, Lake Wales, • Has 25 years of experience
<br /> FL— Project engineer involved with the rehabilitation and expansion of with the design, permitting,
<br /> • an existing 1.9-MGD VM/TF. Rehabilitation items include new headworks construction, and operations
<br /> ® fine screening system, addition on new oxidation ditch rotors with smart of water and wastewater
<br /> biological nutrient reduction system, replacement of clarifier mechanisms, systems including pump
<br /> ® conversion of existing traveling bridge sand filter to disk filter, rehabilitation stations, treatment plants, and
<br /> 0 of an existing aerobic digester, addition of a new aerobic digester, distribution systems
<br /> ® rehabilitation of existing electrical system, and rehabilitation/enhancement • Responsible for the design,
<br /> of the SCADA system. Work includes permitting and a treatment capacity construction management,
<br /> ® expansion to 2.19 MGD. Kimley-Horn will provide full construction and start-up coordination for
<br /> 0 administration as part of a separate contract. numerous membrane water
<br /> treatment plants
<br /> et Continuing Services, Jupiter Island, FL— Project engineer on the Kimley- • Conducted pilot studies
<br /> ® Horn team retained by the Town of Jupiter to assist in its consideration for various water treatment
<br /> ® of the purchase of two privately owned water and wastewater utilities. alternatives and developed
<br /> The firm's responsibilities included evaluation of the existing facilities, preliminary design studies
<br /> O preparation of engineering reports to accompany municipal bond
<br /> prospectus, identifying future capital improvements needed for integrating • Strong process design
<br /> ® the two utilities, and providing advice relative to operation of the facilities experience for all types of water
<br /> • to be purchased. The Town completed this purchase in September 1998 treatment facilities
<br /> ® and formed a utility enterprise within the Town government, naming it • Responsible for the design and
<br /> O South Martin Regional Utility (SMRU). The firm has remained the utility's construction phase services of
<br /> engineering consultant responsible for all engineering functions of the several specialty water systems,
<br /> ® utility. including ion exchange
<br /> ® treatment, filter systems,
<br /> Utilities West Transmission Force Main, In-Line Pump Station, Vero Beach, membrane pilot studies,
<br /> € FL— Served as project manager for the design of an in-line pump station SCADA system integration, and
<br /> • from an existing master pump station to divert wastewater capacity from operational testing of numerous
<br /> • their South Regional Wastewater Treatment Facility to their West Regional municipal treatment systems
<br /> Wastewater Treatment Facility. This approach not only addressed their
<br /> • master planning efforts, but eliminated odor issues at the existing facility, Professional Credentials
<br /> ® allowed planned rehabilitation at the existing pump station, and provided Master of Engineering, Civil
<br /> ® much more flexibility in diverting wastewater to either of their facilities. Engineering, University of Florida
<br /> ® 24-inch West Wastewater Transmission System Inline Booster Station, Vero Bachelor of Science, Ocean
<br /> Beach, FL— Project manager of the Kimley-Horn team who developed Engineering, Florida Institute of
<br /> ® plans and specifications for Indian River County's longest force main Technology
<br /> O transmission system and their first in-line booster pump station. As Professional Engineer in Florida
<br /> ® part of their master plan to divert wastewater capacity from their south
<br /> regional wastewater treatment facility to their west regional wastewater Professional Organizations
<br /> ® treatment facility, Kimley-Horn permitted, designed, and is overseeing the American Water Works
<br /> ® construction of more than eight miles of 24-inch force main transmission Association (AWWA)
<br /> le
<br /> piping. National Association of Corrosion
<br /> ® 90th Avenue In-line Pump Station, Indian River County, FL— Provided Engineers
<br /> survey and design construction services for the new Northwest Regional Southeast Desalting Association
<br /> 0 3-MGD sewer in-line pump station. Original scope included the design
<br /> O of a conventional pump station, but client amended scope to provide rmin Kimley-Horn
<br /> for the construction of an in-line pump station with building in lieu of a �� 1 and Associates,Inc.
<br /> REQ ND-120:-02 3-25
<br /> 0Y260015.12o Sten/Isles CiA_Emion enial Erg Resumes.indd
<br />
|