Laserfiche WebLink
1 ) .Michael Davis <br /> r Stormwater Pump Station Design ydrologic Modeling <br /> 1 <br /> ® Representative Experience Special Qualifications <br /> ® <br /> General Civil Engineering Consultant, Bay Harbor Islands, FL— Served ■ Has 38 years of <br /> as project engineer providing general civil engineering consulting services experience in the design <br /> • for the Town of Bay Harbor Islands, including a force main study, a water of roadways, highways, <br /> ® quality parameters study, groundwater monitoring for underground fuel tank and arterials, and <br /> contamination, drawbridge master plan review, townwide drainage master plan, associated construction <br /> ® landscape architecture rehabilitation for central business district, and consensus plans and construction <br /> ® building for community enhancements associated with eminent roadway, inspection <br /> ® drainage, and utility improvements. The possibility of funding improvements • Responsible for the <br /> through special assessments, general obligation bonds, and grants was roadway design, <br /> • investigated. drainage design and <br /> ® permitting of many <br /> US 1 (Biscayne Boulevard) Over NE 203rd Street PD&E Study and Final South Florida roadways, <br /> • Design, FDOT District Six— Drainage engineer on the design of the grade- including SR 80 <br /> ® separated interchange at this location. Responsible for drainage design, permit • Also responsible for <br /> ® coordination, and permit documentation. Permitted through DERM and SFWMD the drainage design <br /> and included deep well design. <br /> ® and permitting of <br /> HEFT Widening PD&E Study, Final Design, and Permitting, Okeechobee Mainline several segments of <br /> • Toll Plaza Florida's Turnpike Enterprise— Served as drainage engineer on the 1-95 widenings in both <br /> • PD&E project from SR 836 to 1-75 and the design project from the Okeechobee Broward and Palm Beach <br /> ® toll booth to 1-75. Responsible for drainage design, permit coordination, and counties <br /> permit documentation. Project was permitted through DERM and SFWMD. • Expertise in drainage and <br /> ® stormwater management <br /> ® Lincoln Road Mall, Miami Beach, FL— Design engineer for the reconstruction design <br /> of the pedestrian mall/roadway improvements. Responsible for the drainage <br /> ® design, grading, and permit coordination. Permits were obtained from DERM. • Extensive experience in <br /> environmental permitting, <br /> ® <br /> Palmetto Park Road Beautification, Boca Raton, FL— Drainage design engineer including preparation of <br /> ® for this project that included the reconstruction of this major arterial from Dixie bridge hydraulic reports <br /> • Highway to the Intracoastal Waterway in Boca Raton. Responsibilities included and scour analysis <br /> the preparation of construction plans and permitting through the South Florida <br /> Water Management District. <br /> Professional Credentials <br /> to Bachelor of Science, Civil <br /> North Shore Area Roadway Improvements, Miami Beach, FL— Design engineer Engineering, University of <br /> ® for this project that included streetscape design, urban design, landscape Florida <br /> • architecture, roadway engineering, and transportation-related services for the <br /> ® design of approximately three miles of urban streetscape improvements in the <br /> North Shore area of Miami Beach. Permits were obtained through DERM. <br /> ® <br /> Dixie Highway Corridor Study, FDOT District Four— Provided design for this <br /> study to improve the local transportation network along Dixie Highway from NE <br /> ® 203rd Street in Miami-Dade County to Griffin Road in Broward County. The Dixie <br /> • Highway corridor, seven miles long and approximately three square miles wide, <br /> encompasses the northern portion of unincorporated Miami-Dade County and <br /> • the cities of Hallandale, Hollywood, and Dania in Broward County. This project <br /> ® included preparing a corridor planning and design report and preliminary right- <br /> ® of-way maps to secure future right-of-way and determine preliminary costs. This <br /> project also included an extensive public involvement program addressing both <br /> • residential and small business concerns. rmr1 As <br /> Kimley-Horn <br /> \ and Associates,Inc <br /> 0 RRo No.12{04-02 3-31 <br /> 0Y260015.12o Sunny Isles Cbd_ErMromnanal Eng Resumes.indd <br />