Laserfiche WebLink
0 <br /> ® PROFESSIONAL EXPERIENCE <br /> ® As President and Principal Engineer for Tierra South Florida, Inc., Mr. <br /> ® tom- Krishnasamy oversees the geotechnical engineering, construction materials <br /> • I testing, and inspection services operations. Mr. Krishnasamy was the Project <br /> Manager for a 51.2 billion multimedia super corridor project that included <br /> • <br /> t:Th.J universities, commercial buildings, and residential roadways. He was also <br /> Principal Geotechnical Engineer for a S780 million elevated highway, where he <br /> ® established Rock Founding Rationale for deep foundation systems. He was <br /> also Principal Geotechnical Engineer for a $450 million highway that included <br /> ® IMMIMINS <br /> alla land reclamation and soil stabilization. Mr. Krishnasamy has been involved in <br /> ® hundreds of projects of diversified complexity consisting of residential, <br /> commercial, educational, and wastewater treatment facilities, sports arenas, <br /> • <br /> lls, airports, roadways and land <br /> t r r° ABBIREVIATED PROJECT EXPERIENCE reclamation. <br /> ® SOUTH FLORIDA <br /> B Pedestrian Bridge over the Carol City Canal, Miami Gardens, FL <br /> RAJ KRISHNASAMY, P.E. Principal in charge (Geotechnical) — Performed a geotechnical engineering <br /> ® study for the proposed bridge to be located north of the existing NW 175th <br /> President, Principal Street bridge over the Carol City Canal. Field work included Standard <br /> ® Geotechnical Engineer Penetration Test (SPT) borings to 50 feet deep. Performed pile capacity <br /> S analyses for 14-inch precast prestressed square concrete (PPSC) piles for the <br /> 24 Years Professional pedestrian bridge. Provided report summarizing subsurface conditions, i.e. soil <br /> ® <br /> Experience stratification/types and groundwater conditions, as well as geotechnical <br /> ® recommendations regarding pile installation and axial capacity. <br /> EDUCATION <br /> ® Exercise Trail along Country Club Drive, Aventura, FL <br /> MS in Geotechnical Principal in charge (Geotechnical) — Performed a geotechnical exploration for <br /> ® Engineering, University of the improvements at Waterway Park in Palm Beach County, Florida. The park <br /> ® Memphis 1995 developments included group pavilion, picnic shelters, restroom buildings, <br /> BS in Civil Engineering, seawall, dock, roadway, and parking lots. Field work included BoreHole <br /> ® Christian Brothers University Permeability (BHP) tests and Standard Penetration Test (SPT) borings. <br /> ® 1987 Provided recommendations for site preparation, shallow foundation design, <br /> pavement design, and other construction considerations. <br /> • Diploma/1984/Electronic <br /> ® Engineering, Malaysian Air Waterway Park, Palm Beach County, FL <br /> Force Institute Principal in charge (Geotechnical) — Performed a geotechnical exploration for <br /> • the improvements at Waterway Park in Palm Beach County, Florida. The park <br /> developments included group pavilion, picnic shelters, restroom buildings, <br /> ® PROFESSIONAL seawall, dock, roadway, and parking lots. Field work included BoreHole <br /> O ORGANIZATION AND Permeability (BHP) tests and Standard Penetration Test (SPT) borings. <br /> ® REGISTRATION Provided recommendations for site preparation, shallow foundation design, <br /> Professional Engineer: pavement design, and other construction considerations. <br /> e Florida, 53567 SR-997 (Krome Avenue) from SR-94/Kendall Drive to SR-90/SW 8 Street, <br /> e Certified OSHA Supervisor Miami-Dade County, FL <br /> ® Principal in charge (Geotechnical) — Performed a preliminary roadway soil <br /> Certified Environmental survey for Krome Avenue in Miami (approximately 5 miles). The purpose of this <br /> • Consultant study was to provide geotechnical input to the design team to assist in <br /> ® evaluation of the merits of the roadway improvements. Geotechnical <br /> recommendations included the discussion of various options such as <br /> O OFFICE LOCATION surcharge, reinforced soil platform, geosynthetic, demucking and soil mixing. <br /> Also provided geotechnical recommendations involving permanent cut/fill <br /> ® West Palm Beach, Florida <br /> slopes, excavations, groundwater control, pavement design, and on site soil <br /> ® suitability. This project is on-going. <br /> O SW 184th Street from Approximately 1200 Feet East of SW 157th Avenue <br /> • to Approximately 100' West of SW 170th Avenue, Miami-Dade County, FL <br /> Principal in charge (Geotechnical) — Provided Geotechnical recommendations <br /> A and evaluation of the site and subsurface conditions with respect to the planned <br /> ® roadway improvements and for site preparation and foundation construction. <br /> O RFQ No. 12-04-02 <br /> 3-43 <br />