|
0
<br /> ® PROFESSIONAL EXPERIENCE
<br /> ® As President and Principal Engineer for Tierra South Florida, Inc., Mr.
<br /> ® tom- Krishnasamy oversees the geotechnical engineering, construction materials
<br /> • I testing, and inspection services operations. Mr. Krishnasamy was the Project
<br /> Manager for a 51.2 billion multimedia super corridor project that included
<br /> •
<br /> t:Th.J universities, commercial buildings, and residential roadways. He was also
<br /> Principal Geotechnical Engineer for a S780 million elevated highway, where he
<br /> ® established Rock Founding Rationale for deep foundation systems. He was
<br /> also Principal Geotechnical Engineer for a $450 million highway that included
<br /> ® IMMIMINS
<br /> alla land reclamation and soil stabilization. Mr. Krishnasamy has been involved in
<br /> ® hundreds of projects of diversified complexity consisting of residential,
<br /> commercial, educational, and wastewater treatment facilities, sports arenas,
<br /> •
<br /> lls, airports, roadways and land
<br /> t r r° ABBIREVIATED PROJECT EXPERIENCE reclamation.
<br /> ® SOUTH FLORIDA
<br /> B Pedestrian Bridge over the Carol City Canal, Miami Gardens, FL
<br /> RAJ KRISHNASAMY, P.E. Principal in charge (Geotechnical) — Performed a geotechnical engineering
<br /> ® study for the proposed bridge to be located north of the existing NW 175th
<br /> President, Principal Street bridge over the Carol City Canal. Field work included Standard
<br /> ® Geotechnical Engineer Penetration Test (SPT) borings to 50 feet deep. Performed pile capacity
<br /> S analyses for 14-inch precast prestressed square concrete (PPSC) piles for the
<br /> 24 Years Professional pedestrian bridge. Provided report summarizing subsurface conditions, i.e. soil
<br /> ®
<br /> Experience stratification/types and groundwater conditions, as well as geotechnical
<br /> ® recommendations regarding pile installation and axial capacity.
<br /> EDUCATION
<br /> ® Exercise Trail along Country Club Drive, Aventura, FL
<br /> MS in Geotechnical Principal in charge (Geotechnical) — Performed a geotechnical exploration for
<br /> ® Engineering, University of the improvements at Waterway Park in Palm Beach County, Florida. The park
<br /> ® Memphis 1995 developments included group pavilion, picnic shelters, restroom buildings,
<br /> BS in Civil Engineering, seawall, dock, roadway, and parking lots. Field work included BoreHole
<br /> ® Christian Brothers University Permeability (BHP) tests and Standard Penetration Test (SPT) borings.
<br /> ® 1987 Provided recommendations for site preparation, shallow foundation design,
<br /> pavement design, and other construction considerations.
<br /> • Diploma/1984/Electronic
<br /> ® Engineering, Malaysian Air Waterway Park, Palm Beach County, FL
<br /> Force Institute Principal in charge (Geotechnical) — Performed a geotechnical exploration for
<br /> • the improvements at Waterway Park in Palm Beach County, Florida. The park
<br /> developments included group pavilion, picnic shelters, restroom buildings,
<br /> ® PROFESSIONAL seawall, dock, roadway, and parking lots. Field work included BoreHole
<br /> O ORGANIZATION AND Permeability (BHP) tests and Standard Penetration Test (SPT) borings.
<br /> ® REGISTRATION Provided recommendations for site preparation, shallow foundation design,
<br /> Professional Engineer: pavement design, and other construction considerations.
<br /> e Florida, 53567 SR-997 (Krome Avenue) from SR-94/Kendall Drive to SR-90/SW 8 Street,
<br /> e Certified OSHA Supervisor Miami-Dade County, FL
<br /> ® Principal in charge (Geotechnical) — Performed a preliminary roadway soil
<br /> Certified Environmental survey for Krome Avenue in Miami (approximately 5 miles). The purpose of this
<br /> • Consultant study was to provide geotechnical input to the design team to assist in
<br /> ® evaluation of the merits of the roadway improvements. Geotechnical
<br /> recommendations included the discussion of various options such as
<br /> O OFFICE LOCATION surcharge, reinforced soil platform, geosynthetic, demucking and soil mixing.
<br /> Also provided geotechnical recommendations involving permanent cut/fill
<br /> ® West Palm Beach, Florida
<br /> slopes, excavations, groundwater control, pavement design, and on site soil
<br /> ® suitability. This project is on-going.
<br /> O SW 184th Street from Approximately 1200 Feet East of SW 157th Avenue
<br /> • to Approximately 100' West of SW 170th Avenue, Miami-Dade County, FL
<br /> Principal in charge (Geotechnical) — Provided Geotechnical recommendations
<br /> A and evaluation of the site and subsurface conditions with respect to the planned
<br /> ® roadway improvements and for site preparation and foundation construction.
<br /> O RFQ No. 12-04-02
<br /> 3-43
<br />
|