Laserfiche WebLink
® , <br /> • Richard Durr R+LA, AICP <br /> ® QA/QCReviewer <br /> 0 <br /> ® Representative Experience Special Qualifications <br /> MEDIAN AND STREETSCAPE DESIGN o More than 20 years of <br /> ® Citywide Streetscapes,Tamarac, FL—Project manager responsible for the design of 19 miles of planning, design, and <br /> ® streetscape within the City limits of Tamarac. The streetscape design included the addition of new leadership experience with <br /> turn lanes in existing medians, extensive public participation and facilitation,as well as new and streetscape and corridor <br /> ® supplemental landscape plantings, irrigation, and decorative hardscape features. design, park planning and <br /> ® Woodside Drive Landscape, Coral Springs, FL—Project Landscape Architect—Project manager <br /> design, and land use planning <br /> ® for the landscape design for the Woodside Drive roadway project. The landscape design featured Extensive hands-on experience <br /> shade trees where possible along multi-family areas of the roadway corridor, and the use of with project management, <br /> ® smaller ornamental trees to beautify the neighborhood street. master planning, public <br /> ® participation programs, <br /> Streetscape Master Plan, Hollywood, FL—Project Planner and Manager. The project included workshop facilitation, <br /> ® the development of an overall master plan for 52 east-west streets, as well as Al A and Surf Road landscape and hardscape <br /> ® within the Hollywood Beach CRA boundaries. The project served as development guidelines design, computer generated <br /> ® for the public spaces and right of way within the district, but also included guidelines for graphics and visualizations, <br /> development of landscapes, utility connections, parking regulations and sign guidelines. The public presentations, and <br /> ® design package was approved and adopted by the City Commission. construction document <br /> ,, Streetscape Master Plan, Lauderdale Lakes, FL—Project Manager. The project included the preparation <br /> ® development of an overall streetscape master plan for many of the City's major corridors and <br /> Professional Credentials <br /> the application of design standards to residential streets. The project served as development <br /> • guidelines for the public spaces and right of way within the City and also included guidelines Bachelor of Landscape <br /> ® for development of landscapes, gateway features, site amenities, parking regulations and sign Architecture, Landscape <br /> ® guidelines.The design package was approved and adopted by the City Commission. Architecture, University of Florida <br /> ® US 1 Streetscape, Dania Beach, FL—Project Manager. The project included the development Landscape Architect in Florida <br /> ® of a planting design compatible with both of the City's vision for redevelopment in the downtown American Institute of Certified <br /> core and FDOT's planting regulations. The process included applying for and receiving FDOT's Planners <br /> ® Transportation Design for Livable Communities (TDLC) designation for the downtown area. <br /> ® Construction of the project is currently underway. Professional Organizations <br /> Forest Hill Boulevard Streetscape and Grant Application,Wellington, FL American Society of Landscape <br /> ti Project Manager for the project consisting of new street landscaping along 1.5 Miles of Forest Architects <br /> ® Hill Boulevard. The project also included the preparation of a grant application to Palm Beach American Planning Association <br /> ® County for a Landscape Grant. The application was approved and awarded to the Village. Florida Recreation & Parks <br /> • Downtown Landscape and Streetscape Guidelines, Dania Beach, FL—Project Manager. The Association <br /> ® project included the creation of new landscape and streetscape development guidelines within <br /> ® the City's downtown CRA area. The documents were officially adopted by the CRA Commission <br /> and serve as the development regulations for the CRA area. <br /> tit <br /> NE 38th Street Streetscape, Oakland Park, FL—The master planning and design included taking <br /> ® the existing 2-lane roadway and implementing traffic calming solutions to discourage the heavy <br /> ® amount of cut-through traffic within the surrounding residential neighborhood. This process <br /> ® included meetings with homeowners as well as other permitting agencies. The design included <br /> the use of a traffic circle as well as raised intersections at several cross-streets. Also, the travel <br /> ® lanes were narrowed which, along with the use of new landscape, visually narrowed the corridor <br /> ® to create a calmed residential street. <br /> 7" VN Kirnley-Horn <br /> ® R.ro No ;,�, s p I 1 and Associates,Inc. <br /> U30001=.12o Sunny Isles!anCuape Arrl,necture Resumes.intltl 3-5 <br />