|
.0
<br /> Ot ,
<br /> ge 0Leah Ca plica ASLA
<br /> .„.„,..- „,-.-..„:„-•,-,-.,„±-,,,,,,-,_.:7 .._,. --,-.-.,--,..,-.- "` ' Landscape Arch'i'tect
<br /> 0
<br /> 9 Representative Experience Special Qualifications
<br /> O parc24 - Kimley-Horn Vero Beach Office Campus,Vero Beach, FL—Served as landscape • Has four years of experience
<br /> 0 analyst.Assisted the lead landscape architect in the conceptual design and the preparation of a as a project analyst working
<br /> 0 landscape plan for the interior courtyard and the greenroof. on a broad range of landscape
<br /> architecture projects, including
<br /> • Pompano Beach Airpark Continuing Services (including Runway 15-33 rehabilitation), Pompano commercial, mixed-use
<br /> 0 Beach, FL—Serving as landscape analyst assisting with the preparation of mitigation and land development, multi-
<br /> landscape plans. Kimley-Horn is designing the rehabilitation and extension of Runway 15-33, family residential, schools,
<br /> 0 which is the main runway at Pompano Beach Airpark. Other tasks associated with the project streetscapes,and site planning
<br /> • include a feasibility study to reduce the width of the runway to be consistent with ADG B 11 • Proficient in AutoCAD,Adobe
<br /> • Standards and an environmental assessment for the runway extension. Design of this project Photoshop, Sketch-up, and
<br /> began in January 2009. familiar with ArcView GIS
<br /> ® Mosquito Control Restoration projects, St. Lucie County, FL—Environmental analyst assisting
<br /> ® with the data collection and analysis of multiple St. Lucie County impoundment restoration professional Credentials
<br /> 0 projects. Also responsible for construction oversight of several sites within and along the Indian Master of Science, Environmental
<br /> River Lagoon. Science, Oklahoma State
<br /> ® University
<br /> • Indian River Estates,Vero Beach, FL—Served as landscape analyst. The retirement community Bachelor of Science, Landscape
<br /> O is developing a 10-acre addition with a skilled nursing facility along with 11 villas. This addition Contracting, Oklahoma State
<br /> required a landscape plan with a densely vegetated buffer. A design for an interior courtyard and University
<br /> 0 landscape plan was provided. Signage, along with an entry feature, was requested and provided
<br /> 0 with a custom designed bridge feature. Bachelor of Landscape
<br /> Architecture, Landscape
<br /> 0 The Shoppes at Coronado, New Smyrna Beach, FL—Served as landscape analyst. Assisted in Architecture, Oklahoma State
<br /> 0 the development of code minimum landscape plans, tree relocation plans, and low flow irrigation University
<br /> plans for this 48-acre site that houses two large big box stores and nine outparcels.
<br /> 0 Professional Organizations
<br /> Kingsgate Queen's Island, Fort Pierce, FL—Served as task manager. Conducted field work
<br /> • to determine the location of walking/maintenance trails and a canoe/kayak launch, assisted in American Society of Landscape
<br /> • the preparation of a site plan and other exhibits for the permit application, coordinated with the Architects
<br /> O Florida Department of Environmental Protection and U.S.Army Corps of Engineers for an on-site
<br /> O meeting, and developed a mitigation plan in response to the removal of mangroves.
<br /> 0
<br /> 0
<br /> 0
<br /> 0
<br /> •
<br /> •0
<br /> 0
<br /> 0
<br /> 0
<br /> -Horn
<br /> RR)No.1201-02
<br /> \— ndiAssociates,Inc
<br /> U1300014 12o Sunny isles!anoscape Arconeaufe Resumes bola 3-22
<br />
|