|
® Mark Sairtra n
<br /> ® Landscape Architect
<br /> ® Representative Experience Special Qualifications
<br /> ® parc24- Kimley-Horn Vero Beach Office Campus, Vera Beach, FL—Aided with multiple aspects D Has seven years of experience
<br /> ® of the project such as hardscape, landscape, and lighting design, in addition to submitting as a landscape analyst
<br /> ® documentation for LEEDS'certification through the U.S. Green Building Council. Coordinating o Focus areas within the field of
<br /> this project's entry into the Sustainable Sites Initiative (SITES TM) Pilot Program, which is an landscape architecture include
<br /> ® interdisciplinary effort by the American Society of Landscape Architects, the Lady Bird Johnson conceptual design, hardscape
<br /> Wildflower Center at the University of Texas at Austin. and the United States Botanic Garden to detailing, as well as hand line
<br /> create voluntary national guidelines and performance benchmarks for sustainable land design, and digital rendering
<br /> ® construction, and maintenance practices. parc24 promotes a healthier workplace through o Additional experience
<br /> ® architectural innovations that include daylight harvesting and advanced indoor air quality. includes site planning,
<br /> ® Sustainable design components throughout the campus include green roofs, native plantings, landscape design, sustainable
<br /> and permeable pavement. components, construction
<br /> • document preparation, and
<br /> St. Lucie Transportation Planning Organization (TPO) Bicycle Corridor Study, St. Lucie, FL
<br /> ® Served as project analyst for this project, which involved the conceptual design of a bicycle project management
<br /> i'. corridor running north-south in the County and building upon the existing master plan. Work Professional Credentials
<br /> ® included data gathering and analysis, extensive ground truthing, stakeholder meetings, graphic Bachelor of Landscape
<br /> ® design, and presentation to recommending bodies. Additional services included cost estimates, Architecture, Landscape
<br /> funding opportunities, issues, and opportunities. Architecture, Clemson University
<br /> ® Volusia County Metropolitan Planning Organization (MPO) Bicycle/Pedestrian Continuing
<br /> Feasibility Studies,Volusia County, FL—Assessed the feasibility of adding new sidewalks within Professional Organizations
<br /> ® Phase II of the City's integrated bicycle and pedestrian transportation system at the intersection U.S. Green Building Council,
<br /> ® of Mary Avenue and a Florida East Coast Railroad crossing. Evaluated overlay design guidelines Sustainable Sites Initiative
<br /> and site line requirements from multiple agencies, as well as the Phase I construction plans for
<br /> Mary Avenue Streetscape to best design safe, efficient, and accessible pedestrian and bicycle
<br /> ® facilities as a continuation of Phase I. Graphically represented existing conditions, site line
<br /> requirements, Phase I design, and Phase II proposed design as a legible plan for the final report.
<br /> ® Community Church of Vero Beach (CCOVB) Courtyard Design, Vero Beach, FL—Acted as the
<br /> ® lead designer and project manager during the redevelopment of the courtyard at Community
<br /> Church. A formal design incorporates the physical and abstract use of water through thoughtful
<br /> ® material selection and hardscape detailing. Fountains, water walls, and cut stone mosaics are a
<br /> ® few of the elements that reflect the warmth and richness of Community Church's history.
<br /> (� Martin County CRA Redevelopment Projects, Martin County, FL—Providing graphic and
<br /> ® design support for multiple projects as Martin County focuses on the revitalization of seven
<br /> neighborhoods throughout the county. Currently working with the Martin County Community
<br /> ® Redevelopment Agency and involved in streetscape improvements, pedestrian circulation, and
<br /> local parks. Through these projects, neighborhoods will progress into walkable and livable areas.
<br /> ® Kissimmee CRA Redevelopment Projects, Kissimmee, FL—Provides graphic and design
<br /> support for multiple projects to KHA's roadway team as Kissimmee undergoes revitalization of
<br /> ® its downtown corridor. Working with the Kissimmee Community Redevelopment Agency and
<br /> involved in streetscape redevelopment, directory signage and identity concepts, and regional
<br /> ® stormwater analysis. As a result of these projects, businesses have moved back into downtown,
<br /> and neighborhoods have experienced significant physical improvements.
<br /> ('
<br /> ® D OI'7'1 Kimley-Horn
<br /> arc No.12-04-02IS.Or I and Associates,Inc.
<br /> U300014.12o Sunny Isles Landscape Architecture Resumes meld 3-23
<br />
|