who are to furnish materials or equipment fabricated to a special design. The receipt of such list shall <br /> not require the CITY to investigate the qualifications of proposed subcontractors or suppliers, nor <br /> shall it waive the right of the CITY later to object to or reject any proposed subcontractor or supplier, <br /> and is furnished by CONTRACTOR to CITY for informational purposes only. Subject to the rights <br /> of the CITY to purchase supplies and materials in furtherance of the sales tax program as described <br /> in Article 6.16 hereof,CONTRACTOR shall have authority in awarding subcontractors and purchase <br /> orders. <br /> 6.1.3 Extent of Responsibility: CONTRACTOR shall be responsible for the architecture, <br /> engineering,construction and completion of the Project. <br /> 6.2 Guaranteed Maximum Price. <br /> 6.2.1 The Guaranteed Maximum Price is also subject to further reduction by an amount <br /> calculated by multiplying the applicable Florida sales tax rate times the amount of material and <br /> supplies purchased by the CITY under the sales tax program described in Article 6.16 hereof. The <br /> Guaranteed Maximum Price may be modified only as herein provided including possible changes as <br /> a result of Extra Work as may be documented in a City Commission approved Change Order[s]. <br /> 6.2.2 The Guaranteed Maximum Price shall include in the Cost of Work only those taxes <br /> which are enacted at the time the Guaranteed Maximum Price is established. <br /> 6.2.3 The Guaranteed Maximum Price shall include all direct and indirect costs associated <br /> with the design and construction phases of the Project, including but not limited to, procurement of <br /> materials and equipment, labor,overhead,profits, contingency,permits, insurance,performance and <br /> payment bonds,utilities, fees,and taxes. <br /> 6.3 Administration. <br /> 6.3.1 The CONTRACTOR shall schedule and conduct weekly meetings at which the CITY <br /> and CONTRACTOR, and appropriate Subcontractors can discuss the status of the Work. The <br /> CONTRACTOR shall prepare and promptly distribute meeting minutes. <br /> 6.3.2 The CONTRACTOR shall provide monthly written reports to the CITY and <br /> designated consultants on the progress of the entire Work. <br /> 6.3.3 The CONTRACTOR may develop a system of cost control for the Work, including <br /> regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and <br /> proposed changes. <br /> 6.4 Design Responsibilities. <br /> 6.4.1 CONTRACTOR shall prepare preliminary design documents consisting of <br /> preliminary drawings, specifications and other documents to fix and describe the size, quality, <br /> quantity and characters of the Work, its architectural, structural, mechanical and electrical systems <br /> and the materials and other elements of the Work. <br /> 9 CV r . <br />