cost of the CONTRACTOR and be deemed part of the Guaranteed Maximum Price, except for <br /> changes outside the scope of the Work. CONTRACTOR understands and agrees that any information <br /> provided to it by the CITY as to any aspect of the Project is not guaranteed. The CITY'S review of <br /> the design plans shall not be deemed an acceptance of the plans nor be deemed a pre-approval related <br /> to the permitting process that the plans will be required to undergo with the Building Department. <br /> 6.4.1.5 CONTRACTOR shall prepare and submit for review to the CITY a <br /> 90% design package consisting of drawings and specifications for the mechanical, plumbing, <br /> electrical,equipment, instrumentation and all other related work necessary to have a fully functional <br /> and completed Project. <br /> The CONTRACTOR understands and agrees that the CITY,may at its sole discretion, <br /> require changes to the 90%percent design. All such changes shall be made at the sole and exclusive <br /> cost of the CONTRACTOR and be deemed part of the Guaranteed Maximum Price, except of <br /> changes outside the scope of the Work CONTRACTOR understands and agrees that any information <br /> provided to it by the CITY as to any aspect of the Project is not guaranteed. The CITY'S review of <br /> the design plans shall not be deemed an acceptance of the plans nor be deemed a pre-approval related <br /> to the permitting process that the plans will be required to undergo with the Building Department. <br /> 6.4.1.6 CONTRACTOR shall prepare and submit for review to the CITY an <br /> "Issued for Construction"design package, which necessarily includes Plans and Specifications, that <br /> the CONTRACTOR is obligated to produce to the complete satisfaction of the CITY which is deemed <br /> one hundred percent(100%)complete for the construction of the entire Project,which are signed and <br /> sealed by a Florida Licensed Engineer and which are sufficient to secure a permit for the construction <br /> of the entire Project. The CITY shall not make any changes to the Plans and Specifications at 100% <br /> percent design if CONTRACTOR satisfies all comments made by the CITY at 90%percent design. <br /> The CITY'S review of the design plans shall not be deemed an acceptance of the plans nor be deemed <br /> a pm-approval related to the permitting process that the plans will be required to undergo with the <br /> Building Department. The construction phase of the Project shall not commence until the Building <br /> Department has issued a permit based on the 100%"Issued for Construction"design package. <br /> 6.4.2 Once the 100% completed "Issued for Construction" design package has received a <br /> permit from the Building Department to commence construction,these Drawings and Specifications <br /> shall then be considered part of the Contract Documents. <br /> 6.4.3 The CONTRACTOR agrees that any and all revisions that the Florida Building Code <br /> may require to the"Issued for Construction"Drawings and Specifications shall be the responsibility <br /> of the CONTRACTOR and be so revised at the sole and exclusive cost of the CONTRACTOR and <br /> be deemed part of the Guaranteed Maximum Price. <br /> 6.4.4 The CONTRACTOR shall provide to CITY three (3) record sets and three (3) <br /> working sets of full size prints of the Drawings and Specifications. CONTRACTOR shall signify,by <br /> affixing an endorsement(seal/signature,as appropriate)on every sheet of the record set,that the Work <br /> shown on the endorsed sheets was produced by CONTRACTOR. With the record set of prints, <br /> CONTRACTOR shall submit a final set of approved design computations to the CITY. The <br /> 11 V , <br />