My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:31:16 AM
Creation date
2/18/2016 11:31:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2515
Date (mm/dd/yyyy)
01/21/2015
Description
Ric-Man 1st Amd to Agmt Design/Construct Pedestrian Bridge Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 30th, 2015 revealed that permit timeframes in excess of <br /> 259 days. To date, coordination for many of the permits referenced in <br /> the correspondence is still on-going. In the elapsed timeframe, there <br /> has been an escalation of market prices, resulting in a cost increase for <br /> various project components including the material and services for the <br /> electrical components, maintenance of traffic, the steel bridge <br /> members and the masonry for the bridge pedestals. <br /> The proposed 1st amendment also includes an upgrade to the <br /> originally specified decorative lighting system. Ric-Man's contract price <br /> was based on installing lighting on the bridge bottom chord only. A <br /> design alternative included in Ric-Man's proposal was to utilize linear <br /> lighting on both the top and bottom chord of the bridge. Based on <br /> feedback from the City, the lighting system was upgraded to the latter. <br /> During the course of design for the bridge, design changes were <br /> required to accommodate permit comments and actual field conditions. <br /> The easement and project limits established for the southern pedestal <br /> of the bridge were based on conceptual plans. During the design <br /> process of the bridge, it was observed that a portion of the Gateway <br /> garage actually sat within the limits which had previously been <br /> theoretically established for the bridge pedestal. In order to eliminate <br /> this conflict the bridge, a redesigned of the bridge foundation is <br /> required. <br /> This 1st amendment requests a budget increase of $277,665.56 as <br /> well as an additional 371 days to attain final project completion. The <br /> new contract completion date proposed by this amendment is January <br /> 13, 2017. <br /> ADDITIONAL INFORMATION: <br /> The original contract value was $2,100,000. The total monetary value <br /> will be increased by $277,665.56 for a new contract value of <br /> $2,377,665.56. <br /> FUNDING SOURCE: <br /> Account# 300-6-5720-465XXX-15002. <br /> ATTACHMENTS: <br /> Description <br /> Resolution <br /> First Amendment to Agreement <br /> Item Number: 10.1. <br /> 334 <br />
The URL can be used to link to this page
Your browser does not support the video tag.