Laserfiche WebLink
with new stainless steel railing <br /> -Resurface, seal and re-stripe Government Center parking garages' <br /> driving surfaces <br /> -Replace expansion joints at 3rd floor of Government Center parking <br /> garage <br /> -Furnish and install new trench drain at 2nd floor of Government Center <br /> parking garage <br /> -Replace existing trench drains' grates at Government Center parking <br /> garage <br /> -Replace various fire sprinkler heads and escutcheon plates at exterior <br /> of Government Center <br /> -Replace hardware and repaint various doors and frames throughout <br /> Government Center <br /> -Replace existing CCTV camera housings in various areas throughout <br /> Government Center <br /> -Resurface / reseal existing roofs of Government Center and <br /> Commission Chambers buildings <br /> -Paint Tony Roma's restaurant <br /> -Replace various emergency and exit lights throughout Government <br /> Center building <br /> -Apply sealant and replace expansion joint at Government Center <br /> garage 1st floor and stairwell#2 <br /> -Replace vertical expansion joints on north wall of Government Center <br /> building <br /> -Clean and polish granite stone surface at exterior of Government <br /> Center building <br /> -Replace acoustical wall panels at Commission Chambers building <br /> interior <br /> -Replace HVAC system for Commission Chambers Video control room <br /> and Police Department IT Room <br /> -Wet glaze, (reseal), all windows at Government Center building <br /> Current on-going Lynx projects: <br /> -Waterproofing, resurfacing floor and tile repair/replacement at <br /> Commission Chambers fountain <br /> -Installation of a ventilation system at Government Center buildings' <br /> stairwells <br /> -Government Center Generator Replacement <br /> -Heritage Park Stucco Repair <br /> -PCP Stucco Repair <br /> The project budget included monetary allowances to address permitting <br /> costs and a variety of unit cost repairs for which the exact quantities <br /> were unknown at the time of award. Based on the findings of the work <br /> completed to date, additional funding is requested to address the <br /> following existing deficiencies: <br /> 397 <br />