My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2516
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 11:39:58 AM
Creation date
2/18/2016 11:39:53 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2516
Date (mm/dd/yyyy)
01/21/2016
Description
Lynx Construction 1st Amd to Agmt Repairs to Govt Ctr & Heritage Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION <br /> MANAGEMENT <br /> Date: 12/26/15 <br /> Request for Change Order(RCO)#29 <br /> Project: Sunny Isles Government Center Repairs -143915 <br /> Scope: Windows/Mullions Replacement at Gov. Center <br /> 1. Furnish all labor, material, and equipment as required to replace broken windows or <br /> install missing/damaged mullions at the Government Center including the following: <br /> a. Includes an allowance for all design fees necessary to generate signed & sealed <br /> drawings and administrative fees associated with permitting, construction and <br /> inspections. <br /> b. Provide labor, materials and equipment necessary to replace broken window at <br /> 1st floor of Commission Chambers building. <br /> c. Provide labor, materials and equipment necessary to replace broken window at <br /> north end of library at Government Center building. <br /> d. Provide labor, materials and equipment necessary to replace broken window at <br /> west end of Post Office at Government Center building. <br /> e. Provide labor, materials and equipment necessary to install missing mullion at <br /> east end of Government Center building. <br /> f. Provide labor, materials and equipment necessary to repair/replace damaged <br /> mullion at east end of Government Center building. <br /> g. Cost includes an allowance for permitting. <br /> Description Unit Quantity Unit Cost Total <br /> Design Fees (Allowance) LS 1 $4,150.00 $4,150.00 <br /> Replace Window at Comm. Chambers LS 1 $1,371.30 $1,371.30 <br /> Replace Window at Library LS 1 $2,045.50 $2,045.50 <br /> Replace Window at Post Office LS 1 $1,695.50 $1,695.50 <br /> F/I Mullion at West Elevation of Gov. Center LS 1 $1,177.00 $1,177.00 <br /> F/I Mullion at East Elevation of Comm. Cham. LS 1 $1,177.00 $1,177.00 <br /> Permit Fees (Allowance) LS 1 $1,050.85 $1,050.85 <br /> General Conditions LS 1 $4,998.00 $4,998.00 <br /> Subtotal $17,665.15 <br /> 15%OH&P $2,649.77 <br /> 1.2% Liability Insurance $0.00 <br /> 1.0% Bond $0.00 <br /> Total Change Order $20,314.93 <br /> GC reserves the right to request an equitable time extension for rescheduling delays, disruption, <br /> acceleration and/or impact in the event this modification changes the construction sequence <br /> and/or time of completion. <br /> The total amount of this change order request is: $20,314.93 <br /> Acceptance to this proposal will enable Contractor to incorporate into prime contract. <br /> SUBMITTED BY: APPROVED BY: <br /> Dan Sanger <br /> Lynx Construction Management, LLC. Date Accepted to Proceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.