My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2524
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:29:34 PM
Creation date
3/2/2016 3:29:32 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2524
Date ‎(mm/dd/yyyy)‎
02/18/2016
Description
CO #6 to Agmt w/Fla. Engineering & Dev. Corp for 174 St Roadway Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C ilrs`$ City of Sunny Isles Beach <br /> ,f 4- 18070 Collins Avenue <br /> - Sunny Isles Beach, Florida 33160 <br /> 4e 'a°PSt.r (305)947-0606 City Hall <br /> <o <br /> t-qr„ s,jt+ t..''o (305)949-3113 Fax <br /> MEMORANDUM . <br /> TO: The Honorable Mayor and City Commission <br /> VIA: Christopher J. Russo, City Manager <br /> FROM: Elka Linton-Dorsett, Capital Projects Manager <br /> DATE: 2/18/2016 <br /> Resolution Approving Change Order 6 with Florida <br /> Engineering and Development Corporation for <br /> RE: professional Construction Services for the174th Street <br /> Roadway Improvement project to widen the proposed <br /> sidewalks <br /> RECOMMENDATION: <br /> Staff recommends approval of this resolution. <br /> REASONS: <br /> Resolution No. 2015-2401 approved the award of ITB No. 14-11-01 to <br /> Florida Engineering and Development Corporation to provide <br /> professional construction services for the construction of the 174th <br /> Street Roadway Improvement project. The general scope of services <br /> included drainage enhancements, complete sidewalk and roadway <br /> reconstruction from North Bay Road east, to Collins Avenue. <br /> Improvements west of North Bay Road were limited to milling and <br /> resurfacing the existing pavement surface, and minimal sidewalk repair. <br /> New landscaping and irrigation will be installed along the full length of <br /> 174th Street. <br /> Resolution No 2015-2473 approved change orders No 2 and No 3 <br /> increasing the overall contract value by $367,028.55 to reconstruct the <br /> existing 5-ft sidewalk west of North Bay Road and replace the existing <br /> North Miami Beach owned water services within the entire 174th Street <br /> 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.