Laserfiche WebLink
Florida Engineering&Development Corp <br /> • <br /> 12076 NW 98th Ave. <br /> Hialeah Gardens Fl.33018 =QFLORIDA ENGINEERING <br /> - &DEVELOPMENT CORP. <br /> ENGINEERING CONTRACTOR. <br /> Project:NE 174th Street Roadway Improvements LICPCGC 1511029 E95801 <br /> Scope of work:Change in Striping at NE 174 th Street. <br /> Demolish and Reconstruction of existing Driveway. <br /> Location: NE 174th Street <br /> Date: 11/30/2015 <br /> PROPOSED CHANGE ORDER No. 4 <br /> TABLE OF QUANTITIES <br /> A New Item on Striping <br /> No. Item Qty Unit Unit Price Total <br /> 1 3"Speed Humps of 12'long w/Marking 5 Ea $ 1,012.50 $ 5,062.50 <br /> 2 Arrow Paint&Thermoplastic 4 Ea $ 180.00 $ 720.00 <br /> 3 6" White Skip Paint&Thermoplastic 3415 Ea $ 1.65 $ 5,634.75 <br /> Sub-Total New Item on Striping $ 11,417.25 <br /> B Reconstruction of Driveway <br /> No. Item Qty Unit Unit Price Total <br /> 4 Remove Existing Asphalt and Base <br /> 5 Hauling Material 22 Ls $ 1,387.55 $ 30,526.10 <br /> 6 Reconstruction 6"Limerick Base and compact <br /> 7 1"Asphalt <br /> Sub-Total Reconstruction of Driveway $ 30,526.10 <br /> C Loop Detector at Building 300 <br /> No. Item Qty Unit Unit Price Total <br /> 8 Loop Detector 1 Ls $ 2,000.00 $ 2,000.00 <br /> Sub-Total Loop Detector $ 2,000.00 <br /> Sub-Total A+B+C $ 43,943.35 <br /> 15%Overhead,Profit $ 6,591.50 <br /> Sub-total PCO#4 $ 50,534.85 <br /> D Credit Striping <br /> No. Item Qty Unit Unit Price Total <br /> 9 Striping Green Colored Pavement-Per MUTCD. ITEM 28 1 Ls $ 17,000.00 $ 17,000.00 <br /> 10 Parallel Parking(6"White Paint&Thermoplastic) 970 Lf $ 1.65 $ 1,600.50 <br /> 11 18"Solid White 176 Lf $ 2.63 $ 462.88 <br /> Sub-Total Credit $ (19,063.38) <br /> TOTAL PCO#4 $ 31,471.47 <br /> Omar Medina <br /> Florida Engineering <br />