My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2524
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:29:34 PM
Creation date
3/2/2016 3:29:32 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2524
Date (mm/dd/yyyy)
02/18/2016
Description
CO #6 to Agmt w/Fla. Engineering & Dev. Corp for 174 St Roadway Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> FEB 1 0 2016 <br /> „sNy is <br /> Off : Lity of 4 ,nny Islma Beach <br /> -_ :\, Office of he Ct7 Manager <br /> `�. n CONTRACT <br /> ,'_ r.".- * CITY OF <br /> SUNNY ISLES BEACH <br /> AMENDMENT <br /> ys 97• FLOR�O 5�,� <br /> 0,,,-0, 51... 00 <br /> AMENDMENT NUMBER: #4 DATE: 02/08/16 <br /> PROJECT: 174th St Roadway Improvement <br /> BID NUMBER: 14-11-01 <br /> RESOLUTION NUMBER: 2015-2401 <br /> ORIGINAL DOLLAR CONTRACT AMOUNT: $2,965,750.20 <br /> NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $441,498.77 <br /> DOLLAR AMOUNT OF THIS CHANGE ORDER: $31,471.47 <br /> CREDIT/DIRECT PURCHASES: $0 <br /> NEW DOLLAR CONTRACT AMOUNT: $3,332,778.75 <br /> ORIGINAL CONTACT COMPLETION DATE 03.30.16 <br /> TOTAL OF PREVIOUS CHANGE ORDER DAYS: 50 <br /> AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 <br /> NEW CONTRACT COMPLETION DATE: 05.19.16 ' <br /> DESCRIPTION OF SCOPE OR WORK CHANGES: ' <br /> The original scope of work included the addition of bicyde lanes along the full length of the project. <br /> This change order eliminates this scope of work. A credit of$19,063.38 has been included in this <br /> change order to account for the elimination of this striping. However, as a result of this change to <br /> remove the bike lane striping, the proposed speed humps must be extended to the entire pavement <br /> width. As a separate effort, in order to ensure ADA compliance of the new sidewalks, it is necessary to <br /> repave a 5-10ft of existing pavement within the abutting private properties in order to transition the <br /> grade elevations within the established ADA limits. The total change order value will be applied to the <br /> contingency balance of$193,947.45. The remaining contingency balance after RCO #4 is$162,476.45. <br /> NOTE: Unless specifically stated dearly elsewhere on this page, this contract amendment does NOT include an extension of <br /> time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment <br /> and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, induding all direct <br /> and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the issues fr h in this <br /> document. ; <br /> Florida Engineering & <br /> CONTRACTOR: Development Corp <br /> CITY ATTORNEY: Hans Ottinot /lir& <br /> /T.+- <br /> CAPITAL PROJECTS MANAGER: <br /> Elka Linton-Dorsett ; :/ - <br /> ciie____CITY MANAGER: Christopher J. Russo - <br />
The URL can be used to link to this page
Your browser does not support the video tag.