ARTICLE 6 -- CONTRACTOR'S RESPONSIBILITIES <br /> 6.1 SUPERVISION AND SUPERINTENDENCE <br /> A. The CONTRACTOR shall supervise and direct the Work competently and <br /> efficiently, devoting such attention thereto and applying such skills and expertise <br /> as may be necessary to perform the Work in accordance with the Contract <br /> Documents. The CONTRACTOR shall be responsible for the means, methods, <br /> techniques, sequences, and procedures of construction and safety precautions <br /> and programs incidental thereto. The CONTRACTOR shall be responsible to <br /> see that the finished Work complies accurately with the Contract Documents. <br /> B. The CONTRACTOR shall designate in writing and keep on the Work site at all <br /> times during its progress a technically qualified, superintendent, who shall not be <br /> replaced without written notice to the OWNER and the ENGINEER OF <br /> RECORD. The superintendent will be the CONTRACTOR's representative at the <br /> site and shall have authority to act on behalf of the CONTRACTOR. All <br /> communications given to the superintendent shall be as binding as if given to the <br /> CONTRACTOR. The CONTRACTOR shall issue all its communications to the <br /> OWNER through the ENGINEER OF RECORD. <br /> C. The CONTRACTOR's supervisor or superintendent shall be present at the site of <br /> the Work at all times while Work is in progress. Failure to observe this <br /> requirement shall be considered as suspension of the Work by the <br /> CONTRACTOR until such time as such supervisor or superintendent is again <br /> present at the site. <br /> 6.2 LABOR, MATERIALS, AND EQUIPMENT <br /> A. The CONTRACTOR shall provide competent, suitably qualified personnel to <br /> survey and lay out the Work and perform construction as required by the <br /> Contract Documents. The CONTRACTOR shall furnish, erect, maintain, and <br /> remove the construction plant and any temporary works as may be required. <br /> The CONTRACTOR shall at all times maintain good discipline and order at the <br /> site. Except in connection with the safety or protection of persons or the Work or <br /> property at the site or adjacent thereto, and except as otherwise indicated in the <br /> Contract Documents, all Work at the site shall be performed during regular <br /> working hours, and the CONTRACTOR will not permit overtime Work or the <br /> performance of Work on Saturday, Sunday, or any legal holiday without the <br /> OWNER's written consent given after prior written notice to the ENGINEER OF <br /> RECORD. <br /> B. Except as otherwise provided in this Paragraph, the CONTRACTOR shall <br /> receive no additional compensation for overtime Work, i.e., Work in excess of <br /> eight (8) hours in any one calendar day or forty (40) hours in any one calendar <br /> week, even though such overtime Work may be required under emergency <br /> conditions and may be ordered by the ENGINEER OF RECORD in writing. <br /> Additional compensation will be paid the CONTRACTOR for overtime Work only <br /> in the event extra Work is ordered by the ENGINEER OF RECORD and the <br /> change order specifically authorizes the use of overtime Work and then only to <br /> 00700- 11/39 <br /> il � <br />