Laserfiche WebLink
ARTICLE 7 -- OTHER WORK <br /> 7.1 RELATED WORK AT SITE <br /> A. The OWNER may perform other Work related to the Project at the site by the <br /> OWNER's own forces, have other Work performed by utility owners, or let other <br /> direct contracts therefor which may contain General Conditions similar to these. <br /> If the fact that such other Work is to be performed was not noted in the Contract <br /> Documents, written notice thereof will be given to the CONTRACTOR prior to <br /> starting any such other Work. <br /> B. The CONTRACTOR shall afford each utility owner and other contractor who is a <br /> party to such a direct contract (or the OWNER, if the OWNER is performing the <br /> additional Work with the OWNER's employees) proper and safe access to the <br /> site and a reasonable opportunity for the introduction and storage of materials <br /> and equipment and the execution of such Work, and shall properly connect and <br /> coordinate the Work with theirs. The CONTRACTOR shall do all cutting, fitting, <br /> and patching of the Work that may be required to make its several parts come <br /> together properly and integrate with such other Work. The CONTRACTOR shall <br /> not endanger any Work of others by cutting, excavating, or otherwise altering <br /> their Work and will only cut or alter their Work with the written consent of the <br /> ENGINEER OF RECORD and the others whose Work will be affected. <br /> C. If any part of the CONTRACTOR's Work depends for proper execution or results <br /> upon the Work of any such other contractor or utility owner (or OWNER), the <br /> CONTRACTOR shall inspect and report to the ENGINEER OF RECORD in writing <br /> any delays, defects, or deficiencies in such Work that render it unavailable or <br /> unsuitable for such proper execution and results. The CONTRACTOR's failure to <br /> report such delays, defects, or deficiencies will constitute an acceptance of the other <br /> Work as fit and proper for integration with the CONTRACTOR's Work except for <br /> latent or nonapparent defects and deficiencies in the other Work. <br /> 7.2 COORDINATION <br /> A. If the OWNER contracts with others for the performance of other Work on the <br /> Project at the site, the person or organization who will have authority and <br /> responsibility for coordination of the activities among the various prime <br /> contractors will be identified in the Supplementary General Conditions, and the <br /> specific matters to be covered by such authority and responsibility will be <br /> itemized and the extent of such authority and responsibilities will be provided in <br /> the Supplementary General Conditions. Unless otherwise provided in the <br /> Supplementary General Conditions, neither the OWNER nor the ENGINEER OF <br /> RECORD shall have any authority or responsibility in respect of such <br /> coordination. <br /> 00700- 17/39 <br /> � � J <br />