My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2525
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 4:01:22 PM
Creation date
3/2/2016 3:33:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2525
Date (mm/dd/yyyy)
02/18/2016
Description
Agmt w/ Rohl Networks Construct Collins Utility Underground Bid 15-12-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8 -- OWNER'S RESPONSIBILITIES <br /> 8.1 COMMUNICATIONS <br /> A. The OWNER shall issue all its communications to the CONTRACTOR through <br /> the ENGINEER OF RECORD. <br /> 8.2 PAYMENTS <br /> A. The OWNER shall make payments to the CONTRACTOR as provided in <br /> Paragraphs 14.5 and 14.8. <br /> 8.3 LANDS, EASEMENTS, AND SURVEYS <br /> A. The OWNER's duties in respect of providing lands and easements and providing <br /> engineering surveys to establish reference points are set forth in Paragraphs 4.1 <br /> and 4.5. The OWNER shall identify and make available to the CONTRACTOR <br /> copies of reports of explorations and tests of subsurface conditions at the site <br /> and in existing structures which have been utilized by the ENGINEER OF <br /> RECORD in preparing the Drawings and Technical Specifications as set forth in <br /> Paragraph 4.2. <br /> 8.4 CHANGE ORDERS <br /> A. The OWNER shall execute Change Orders as indicated in Paragraph 10.1D. <br /> 8.5 INSPECTIONS AND TESTS <br /> A. The OWNER's responsibility in respect of certain inspections, tests, and <br /> approvals is set forth in Paragraph 13.3B. <br /> 8.6 SUSPENSION OF WORK <br /> A. In connection with the OWNER's right to stop Work or suspend Work, see <br /> Paragraphs 13.4 and 15.1. Paragraphs 15.2 and 15.3 deal with the OWNER's <br /> right to terminate services of the CONTRACTOR under certain circumstances. <br /> ARTICLE 9 -- ENGINEER OF RECORD'S AND OWNER REPRESENTATIVE'S STATUS <br /> DURING CONSTRUCTION <br /> 9.1 ENGINEER OF RECORD <br /> A. The ENGINEER OF RECORD will be the OWNER's technical representative <br /> during the construction period. The duties and responsibilities and the limitations <br /> of authority of the ENGINEER OF RECORD during construction are set forth in <br /> the Contract Documents. <br /> 00700- 18/39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.