B. In case the CONTRACTOR falls behind schedule or where the nature of the Work <br /> requires special attention, the CONTRACTOR may be permitted to work additional shifts <br /> or to work beyond normal working hours, provided the CONTRACTOR has requested an <br /> approval for change of its Work schedule, in writing, from the ENGINEER OF RECORD. <br /> In any event, the cost for working additional shifts or beyond normal working hours, <br /> unless such Work is required by a change order action or in emergency, shall be borne <br /> solely by the CONTRACTOR without any additional cost to the OWNER, including the <br /> cost of Resident Project Representative's services. If authorized, the CONTRACTOR <br /> shall provide written notice to residences that may be impacted by the work. <br /> D. None but skilled foremen and workmen shall be employed on work requiring special <br /> qualifications. Except as otherwise required by law, convicted felons who have not <br /> completed their sentences or other workers from county, state or federal prisons who are <br /> on work release programs shall not be employed for work on this project. <br /> SGC-6.5 SUBCONTRACT LIMITATIONS <br /> A. In addition to the provisions of Paragraph 6.5 of the General Conditions, the <br /> CONTRACTOR shall perform not less than twenty (20) percent of the Work with its own <br /> forces (i.e., without subcontracting). The twenty (20) percent requirement shall be <br /> understood to refer to the Work, the value of which totals not less than twenty (20) <br /> percent of the Contract Price. <br /> B. The apparent low bidder, and such bidders as the OWNER may request in writing, shall <br /> submit to the OWNER a list of all subcontractors and other persons and organizations <br /> (including those who are to furnish the principal items of materials and equipment) <br /> proposed for any portion of this Project. When this list is approved, no deviations shall <br /> be allowed from that list without the written consent of the ENGINEER OF RECORD. <br /> ARTICLE 6 - CONTRACTORS RESPONSIBILITIES <br /> Add the following subarticles to the General Conditions: <br /> SGC-6.11 SHOP DRAWINGS AND SAMPLES <br /> Add the following paragraphs to Article 6.11 of the General Conditions: <br /> A. CONTRACTOR shall submit Shop Drawings as required by the Technical Specifications. <br /> The purpose of the Shop Drawings is to show the suitability, efficiency, technique of <br /> manufacture, installation requirements, details of the item and evidence of its <br /> compliance or noncompliance with the Contract Documents. <br /> B. Within thirty (30) calendar days after the Project Initiation Date specified in the Notice to <br /> Proceed, CONTRACTOR shall submit to ENGINEER OF RECORD a complete list of <br /> preliminary data on items for which Shop Drawings are to be submitted and shall identify <br /> the critical items. Approval of this list by ENGINEER OF RECORD shall in no way <br /> relieve CONTRACTOR from submitting complete Shop Drawings and providing <br /> 00800-3/13 <br />