My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2525
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 4:01:22 PM
Creation date
3/2/2016 3:33:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2525
Date (mm/dd/yyyy)
02/18/2016
Description
Agmt w/ Rohl Networks Construct Collins Utility Underground Bid 15-12-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
materials, equipment, etc., fully in accordance with the Contract Documents. This <br /> procedure is required in order to expedite final approval of Shop Drawings. <br /> C. After the approval of the list of items required in Paragraph B above, CONTRACTOR <br /> shall promptly request Shop Drawings from the various manufacturers, fabricators, and <br /> suppliers. CONTRACTOR shall include all shop drawings and other submittals in its <br /> certification. <br /> D. CONTRACTOR shall thoroughly review and check the Shop Drawings and each and <br /> every copy shall show this approval thereon. <br /> E. If the Shop Drawings show or indicate departures from the Contract requirements, <br /> CONTRACTOR shall make specific mention thereof in its letter of transmittal. Failure to <br /> point out such departures shall not relieve CONTRACTOR from its responsibility to <br /> comply with the Contract Documents. <br /> F. ENGINEER OF RECORD shall review and approve Shop Drawings within fifteen (15) <br /> calendar days from the date received, unless said Drawings are rejected by ENGINEER <br /> OF RECORD for material reasons. ENGINEER OF RECORD's approval of Shop <br /> Drawings will be general and shall not relieve CONTRACTOR of responsibility for the <br /> accuracy of such Drawings, nor for the proper fitting and construction of the work, nor for <br /> the furnishing of materials or work required by the Contract Documents and not indicated <br /> on the Drawings. No work called for by Shop Drawings shall be performed until the said <br /> Drawings have been approved by ENGINEER OF RECORD. Approval shall not relieve <br /> CONTRACTOR from responsibility for errors or omissions of any sort on the Shop <br /> Drawings. <br /> G. No approval will be given to partial submittals of Shop Drawings for items which <br /> interconnect and/or are interdependent where necessary to properly evaluate the <br /> design. It is CONTRACTOR's responsibility to assemble the Shop Drawings for all such <br /> interconnecting and/or interdependent items, check them and then make one submittal <br /> to ENGINEER OF RECORD along with its comments as to compliance, noncompliance, <br /> or features requiring special attention. <br /> H. If catalog sheets or prints of manufacturers' standard drawings are submitted as Shop <br /> Drawings, any additional information or changes on such drawings shall be typewritten <br /> or lettered in ink. <br /> CONTRACTOR shall submit the number of copies required by ENGINEER OF <br /> RECORD. Resubmissions of Shop Drawings shall be made in the same quantity until <br /> final approval is obtained. <br /> J. CONTRACTOR shall keep one set of Shop Drawings marked with ENGINEER OF <br /> RECORD's approval at the job site at all times. <br /> 00800-4/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.