My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2525
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 4:01:22 PM
Creation date
3/2/2016 3:33:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2525
Date (mm/dd/yyyy)
02/18/2016
Description
Agmt w/ Rohl Networks Construct Collins Utility Underground Bid 15-12-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SGC-6.13 INDEMNIFICATION <br /> A. Pursuant to Section 725.06 of the Florida Statutes, the CONTRACTOR hereby <br /> acknowledges receipt and the adequacy of the specific consideration in the amount of <br /> one hundred ($100.00) which sum is included in the Total Bid Price, as payment from <br /> the OWNER to the CONTRACTOR for the indemnification given by the CONTRACTOR <br /> to the OWNER and ENGINEER OF RECORD under the "General Conditions". <br /> SGC-6.16 LAYING OUT THE WORK <br /> A. The CONTRACTOR shall be held responsible for establishing all lines and grades <br /> together with all reference points as required by the various trades for all Work under <br /> this contract. All required layout shall be done using competent and experienced <br /> personnel under the supervision of a local professional engineer and/or land surveyor <br /> registered in the State of Florida. <br /> SGC-6.17 EQUIPMENT <br /> A. All construction equipment necessary and required for the proper construction of this <br /> project shall be on the construction site, in first-class working condition, and shall have <br /> been approved by the ENGINEER OF RECORD before construction is permitted to <br /> start. The CONTRACTOR shall provide such tamping tools and equipment as are <br /> necessary for the proper compaction of the backfill. <br /> SGC-6.18 TRENCH SAFETY ACT <br /> A. Trench excavations over five (5) feet deep shall comply with OSHA 29 CFR 196.650. A <br /> CONTRACTOR's statement that the CONTRACTOR will comply is required. Trenching <br /> costs shall be included in the appropriate unit and /or lump sum prices for the respective <br /> work in which such trenching is required. <br /> SGC-9.3 DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF RESIDENT <br /> PROJECT REPRESENTATIVE <br /> A. General: The Resident Project Representative (RPR) is also referred to as the <br /> ENGINEER OF RECORD. <br /> B. Duties and Responsibilities: Resident Project Representative will: <br /> 1. Review the progress schedule of Shop Drawing submittals and schedule of <br /> values prepared by the CONTRACTOR. <br /> 2. Attend preconstruction conferences. Arrange a schedule of progress meetings <br /> and other job conferences as required. Attend meetings and maintain and <br /> circulate copies of minutes thereof. <br /> 3. Will assist the CONTRACTOR's superintendent in understanding the intent of the <br /> Contract Documents. <br /> 00800-5/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.