My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2525
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 4:01:22 PM
Creation date
3/2/2016 3:33:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2525
Date (mm/dd/yyyy)
02/18/2016
Description
Agmt w/ Rohl Networks Construct Collins Utility Underground Bid 15-12-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Receive and record date of receipt of Shop Drawings and samples, receive <br /> samples which are furnished at the site by the CONTRACTOR. <br /> 5. Conduct on-site observations of the Work in progress and determine if the Work <br /> is proceeding in accordance with the Contract Documents. <br /> 6. Verify that the tests, equipment, and systems startups and operating and <br /> maintenance instruction are conducted as required by the Contract Documents <br /> and in presence of the required personnel, and that the CONTRACTOR <br /> maintains adequate records thereof; observe, record and report the appropriate <br /> details relative to the test procedures and startups. <br /> 7. Accompany visiting inspectors representing public or other agencies having <br /> jurisdiction over the Work, record the outcome of these inspections. <br /> 8. Review applications for payment with the CONTRACTOR for compliance with the <br /> established procedure for their submittal. <br /> 9. Prepare a Certificate of Substantial Completion/Notice of completion, as <br /> applicable, submit to the CONTRACTOR a list of observed items requiring <br /> completion or correction. <br /> 10. Conduct final review of the Work and prepare a punch list of items to be <br /> completed or corrected. <br /> 11. Verify that all items on the punch list have been completed or corrected. <br /> C. Limitations of Authority: The resident Project Representative: <br /> A. Will not authorize any deviation from the Contract Documents or approve any substitute <br /> material or equipment. <br /> 2. Will not exceed limitations on the ENGINEER OF RECORD's authority as set <br /> forth in the Contract Documents. <br /> 3. Will not undertake any of the responsibilities of the CONTRACTOR, <br /> subcontractors or CONTRACTOR's superintendent, or expedite the Work. <br /> 4. Will not advise on or issue directions relative to any aspect of the means, <br /> methods, techniques, sequences, or procedures of construction unless such is <br /> specifically called for in the Contract Documents. <br /> 5. Will not advise on or issue directions as to safety precautions and programs in <br /> connection with the Work. <br /> 6. Will not participate in specialized field or laboratory test. <br /> ARTICLE 10 - CHANGES IN THE WORK <br /> Add the following subarticles to the General Conditions: <br /> 00800-6/13 <br /> L;; it <br />
The URL can be used to link to this page
Your browser does not support the video tag.