My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2525
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 4:01:22 PM
Creation date
3/2/2016 3:33:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2525
Date (mm/dd/yyyy)
02/18/2016
Description
Agmt w/ Rohl Networks Construct Collins Utility Underground Bid 15-12-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
delay, the contractor must demonstrate that critical path activities were suspended during the <br /> exceptionally adverse weather event for more than fifty percent (50%) of the work period of the <br /> day of the exceptionally adverse weather. <br /> Hurricane Precautions: During such periods of time as are designated by the United States <br /> Weather Bureau as being a hurricane watch or warning, the contractor, at no cost to the City, <br /> shall take all precautions necessary to secure the Project site in response to all threatened <br /> storm events, regardless of whether the City or the ENGINEER OF RECORD has given notice <br /> of same. <br /> Compliance with any specific hurricane watch or warning precautions will not constitute <br /> additional work. <br /> Consideration of additional contract time relating to hurricane watch or warning at the Project <br /> site will be addressed by a Change Order in accordance with the non-compensable excusable <br /> delays section of the General Conditions. <br /> Suspension of the Work caused by a threatened or actual storm event, regardless of whether <br /> the City has directed such suspension, will entitle the contractor to additional contract time as <br /> non-compensable, excusable delay, and shall not give rise to a claim for compensable delay. <br /> SGC-14.3C AMOUNT OF RETENTION <br /> Add the following to Article 14.3 Paragraph C of the General Conditions: <br /> Unless otherwise prescribed by law, the OWNER may retain a portion of the amount <br /> otherwise due to the CONTRACTOR, as follows: <br /> • Retention of ten percent (10%) of each approved progress payment until the <br /> Work is ninety percent (90%) complete and accepted by the owner, <br /> • And retention of five percent (5%) of each approved progress payment until the <br /> Work is one hundred percent (100%) complete and accepted by the owner. <br /> SGC-14.3D VALUE OF MATERIALS STORED AT THE SITE <br /> NO PAYMENT WILL BE MADE FOR MATERIALS STORED AT THE SITE. <br /> ARTICLE 16 - MISCELLANEOUS <br /> Add the following subarticles to the General Conditions: <br /> SGC-16.4 WATER SUPPLY <br /> A. All water required for testing, flushing and construction shall be the full responsibility of <br /> the CONTRACTOR in accordance with requirements set forth in the Specifications. <br /> SGC-16.5 USE OF COMPLETED PORTIONS OF WORK <br /> A. The OWNER shall have the right to take possession of and use any completed or <br /> partially completed portion of the Work, notwithstanding the fact that the time for <br /> completing the entire Work or such portions may not have expired, but such taking <br /> 00800- 12/13 °� <br />