Laserfiche WebLink
possession and use shall not be deemed an acceptance of any Work not completed in <br /> accordance with the Contract Documents. <br /> SGC-16.6 SALVAGE <br /> A. Any existing equipment or material, including but not limited to: valves, pipes, fittings, <br /> couplings, etc., which is removed as a result of construction under this project may be <br /> designated to the OWNER at a location directed by the ENGINEER OF RECORD. Any <br /> equipment or material not worth of salvaging shall be disposed of by the CONTRACTOR <br /> in a sound environmental manner in an approved final disposal site. <br /> SGC-16.7 LIMITATIONS OF OPERATION <br /> A. The CONTRACTOR shall, at all times, conduct the Work in such a manner and in such <br /> sequence as will ensure the least practicable interference. The ENGINEER OF <br /> RECORD may require the CONTRACTOR to finish a section on which Work is in <br /> progress before Work is started on any additional section. <br /> SGC-16.8 ITEMS SPECIFIED ON DRAWINGS <br /> A. Items of material, equipment, machinery and the like may be specified on the Drawings <br /> and not in the Specifications. Such items shall be provided by the CONTRACTOR in <br /> accordance with the specifications on the Drawings. <br /> - END OF SECTION - <br /> 00800- 13/13 Z'"q (r� <br />