Laserfiche WebLink
TASK 3-Existing Conditions <br /> Subtask 3.1 -CONSULTANT shall research existing atlases, right-of-way maps, survey, plat, and as- <br /> builts to assess completeness. Once compiled, information will be analyzed to determine if sufficient <br /> to create a base file for design within the corridor. Deficient information will be further analyzed to <br /> determine if absolutely necessary for a complete design. Where determined necessary but <br /> unavailable, a separate scope of services will be provided to obtain additional information. The <br /> purpose of this task is to gather information necessary to create an electronic base-file depicting <br /> existing conditions to be used for design. <br /> • <br /> Subtask 3.2 - Upon gathering existing conditions information and establishing criteria for proposed <br /> design (Subtasks 2.1, 2.2 and 2.3), cost estimates and schedule assumptions can be further refined. <br /> CONSULTANT shall re-assess costs estimates and schedule assumptions provided within Subtask <br /> 1.1. CONSULTANT'S estimate shall be preliminary in nature.and dependent Upon the accuracy and <br /> Comprehensiveness of available information. <br /> Note: The above services do not include undergrounding of overhead Transmission Lines. By their nature, <br /> undergrounding of Transmission Lines involve more significant issues and are handled within a separate division within <br /> FP&L To avoid impacting progression of undergrounding efforts, Transmission Lines will not be addressed within the <br /> above scope of services. <br /> INFORMATION PROVIDE BY CLIENT: <br /> • Aerial exhibit of existing pole locations in CAD format <br /> • Any available Atlas and/or as-built information for existing infrastructure. <br /> PAYMENT SCHEDULE <br /> TASK I DESCRIPTION PAYMENT TYPE I PAYMENT AMOUNT <br /> . Subtask 1.1 I Budget Estimate Lump Sum I $6200.00 <br /> •Subtak 12 Project Presentation Lump Sum S 2,820.00 <br /> Subtask 2.1 Mtg.'s w/FP&L T&M $7,810.00 <br /> Subtask 22 I Mtg.'s Vnr/Utilities T&M S 3,710.00 <br /> Subtask 2.3 Mkt.'s w/FOOT T&M I S 2,150.00 <br /> •Subtask 2 4 Mtg.'s and Coordination(CITY) I T&M S 6,800.00• <br /> Sutitask2.5 I Explore Lighuhg'lssues I T&M I $7,100.00 <br /> 'Subtask 3.i I Re earth Efcisting tritorfnation I Lump Sum , S10,670.00 <br /> 'Subtask 32 I•Pie6miriary Cost Estimate Lump Sum $7,420.00 <br /> Professional Services Agreement <br /> • Project Nanie: Utility Undergroundng Consulting <br /> Project Location:Sunny Isles Beach,FL. <br /> c,' KEITH and SCHNARS, P.A. K&S Proposal No.:P5098.MK <br /> ' ENGINEERS,PLANNERS,SURVEYORS Revised r ebruary 5,2013 Page o <br /> SIB <br />