My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 16-Z-158
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2016
>
Zoning Resolution 16-Z-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:25:07 AM
Creation date
5/3/2016 2:10:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
16-Z-158
Date (mm/dd/yyyy)
04/21/2016
Description
La Playa Beach Assoc, Varadero Project, 18801 Collins Ave. (Hrg#Z2016-03)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> <br />lieu of a closed gate, only during working hours. Finally, like at Jade Signature, we may <br />light the fence-mounted signage, upon approval from the City of Sunny Isles Beach. <br /> <br /> <br />Provide erosion sediment control plans, if applicable. <br /> <br />As we currently have not selected a contractor at this time, we have not had erosion <br />and sediment control plans prepared. They will be prepared by a licensed, registered <br />professional and will be in accordance with all national, State, County, and City <br />requirements. Once prepared, we will have the selected contractor provide copies to <br />amend this plan and obtain all required permits. <br /> <br /> <br />III. Public Beach Access Protection and Closure <br /> <br />Contractor Information: Please include name, company, address, phone number, <br />email, cell phone number. <br /> <br />To be determined <br /> <br />Project Location: 18801 Collins Avenue, Sunny Isles Beach, FL 33160 <br /> <br />Estimated Start Date – Walkway Protection: May 2017 (installation around the <br />construction of 4th floor structure) <br />Estimated Start Date – Walkway Closure: September 2019 (very end of project) <br /> <br />Estimated Completion Date – Walkway Protection: September 2019 <br />Estimated Completion Date – Walkway Closure: December 2019 (very end of <br />project) <br /> <br />Hours of Operation: For overhead walkway protection, the system will be in place <br />twenty-four (24) hours a day, seven (7) days a week. For the Walkway Closure for <br />beach access improvement project, refer to section II, above <br /> <br />Project Task: Describe how and what will be demolished; include equipment to be <br />used. <br /> <br />Removal of pavers, base, landscaping, benches, lighting, signage, etc. to allow for <br />installation of new beach access walkway in accordance with new City of Sunny Isles <br />Beach standards. <br />a. Bobcats <br />b. Generators <br />c. Trucks <br />d. Small concrete pumps <br />e. Concrete trucks <br />f. Compaction equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.