d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hollywood Beach Management, Hollywood, FL
<br />
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing 2012
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Manager coordinating installation of 13 biological monitoring transects and pre-construction biological
<br />survey. Biological monitoring included a hardbottom edge and emergent epifauna survey, nearshore transect data (video,
<br />sediment depth, sand/hardbottom line intercept measurements, and permanent quadrat assessments), Acropora
<br />cervicornis data (health indices and sediment depth), and artificial reef data (sediment accumulation and photographic
<br />documentation). To supplement the pre-construction dataset for the current Project, data recorded in April 2011 during
<br />the five year post-construction monitoring event on four 30 m transects monitored for the Broward County Segment III
<br />Shore Protection Project was also analyzed. Managing post construction compliance efforts including hardbottom and
<br />epifaunal edge surveys and regulatory permit compliance.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Kennedy Park Shoreline Stabilization, Miami, FL
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design and environmental permitting for a shoreline stabilization and enhancement project. Conducted detailed
<br />mangrove and upland vegetation and topographic surveys to determine areas in need of enhancement and
<br />placement of view corridors. Improving shoreline at existing passive use park to include exotic removal, stabilizing
<br />shoreline with native vegetation and properly permitted natural shoreline stabilization and creation of public view
<br />corridors through key locations within densely vegetated mangrove fringe.
<br />
<br />f.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Rickenbacker Causeway Recreational Area, Miami-Dade County,
<br />FL
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2010 2010
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Permitting of shoreline stabilization and associated public recreation area improvements along 2.5 miles of shoreline of
<br />the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys completed and coastal
<br />engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline stabilization
<br />methods. Design elements included landscaping, invasive species removal with native species restoration, parking
<br />improvements, stormwater management and vendor kiosks for waterfront activities.
<br />
<br />
<br />g.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Reach 8/South End Restoration, Palm Beach County, FL
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Manager directing and reviewing feasibility study, Equilibrium Toe of Fill Assessment, Mitigation
<br />Design, and modeling to support application processing for proposed beach nourishment project for the south end of the
<br />Town. Engineering assessment to evaluate sediment coming into project area from updrift beach renourishment and
<br />corresponding adjustment to project construction template. Further adjustments to template to accommodate requests
<br />from NGOs to secure support for project. Evaluated beach management, environmental permitting options and
<br />processing environmental permits to authorize beach project.
<br />h.
<br />(1) TITLE AND LOCATION (City and State)
<br />Village of Bal Harbour Beach Management, Bal Harbour, FL
<br />
<br />
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Reviewed coastal processes and sediment budget at Bakers Haulover Inlet, including the Village shoreline. Evaluated
<br />bypassing alternatives, and prepared conceptual design of inlet bypassing options that could potentially reduce erosion at
<br />the Village, which is located downdrift of the Bakers Haulover Inlet. Additionally, evaluated feasibility of a bypassing
<br />operation with regards to regulatory approval and potential funding sources, including inlet tax district opportunities.
<br />Prepared Joint Coastal Permit applications and advise the Village Council on shoreline processes and management.
<br />i.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Village of Key Biscayne Beach Renourishment, Miami-Dade
<br />County, FL
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing 2012
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project manager providing strategic beach management consulting services to Village. Designed and permitted
<br />37,485 cubic yard truck haul beach renourishment project, to include authorization for maintenance renourishment
<br />events. Managed development, pre-construction survey, and oversee post construction seagrass surveys to ensure no
<br />impacts from beach equilibration. The project was designed to avoid direct impacts to nearshore seagrasses and avoid
<br />mitigation requirements.
<br />
|