|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />
<br />
<br />
<br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Jordon Cheifet, P.E., C.F.M. Coastal Engineer a. TOTAL b. WITH CURRENT FIRM
<br />10 4
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Coastal Systems International, West Palm Beach, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Master of Science, Ocean and Resources Engineering,
<br />University of Hawaii, 2005
<br />Bachelor of Science, Civil Engineering, Pennsylvania
<br />State University, 2002
<br />Professional Engineer – AL, FL
<br />Certified Floodplain Manager
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />
<br />
<br />
<br />Mr. Cheifet is a coastal engineer with more than 10 years of diverse, professional experience. His wide-ranging expertise
<br />includes FEMA coastal floodplain mapping, shore protection structure design, numerical modeling, feasibility studies, and
<br />dredging projects. He is capable in multiple numerical modeling techniques and is well-versed in the latest coastal design
<br />manuals such as the CEM and SPM. Mr. Cheifet has extensive topographic and bathymetric survey experience where he has
<br />utilized RTK GPS, total stations, and echo sounders for topographic and beach profile surveys. His field experience includes
<br />above and underwater inspections, GIS/GPS data collection, surveying, and construction oversight. Mr. Cheifet also has
<br />extensive knowledge of GIS applications to coastal engineering and has leveraged this technology through desktop, server,
<br />and mobile platforms on multiple projects including coastal flooding, wetland restoration, dredging, and offshore wind farm
<br />siting.
<br />
<br />Mr. Cheifet completes most of his design and construction work using a variety of coastal and civil design software that
<br />includes MIKE21-SW, MIKE21-FM, STWAVE, CHAMP, ACES, ArcGIS, AutoCAD, and HYPACK.
<br />
<br />PROFESSIONAL AFFILIATIONS: American Society of Floodplain Managers, Florida Floodplain Managers
<br />Association
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />40-50 Blossom Way Due Diligence, Town of Palm Beach, FL
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2013 N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Coastal Systems provided coastal engineering consulting services to a private client as part of a due diligence assessment
<br />for an oceanfront property acquisition in the Town of Palm Beach. Services included site inspection of coastal structures,
<br />assessment of beach erosion issues, interpretation of Town, County, and State beach nourishment data to assess short-
<br />and long-term erosion and beach stability trends.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />City-Wide Dock Maintenance, West Palm Beach, FL
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 2014
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Above- and underwater investigation of 2 existing fishing piers to evaluate conditions. Issued engineering report
<br />summarizing the assessment and provided recommendations and cost estimates for potential structural rehabilitation.
<br />Structural design of new fishing pier at El Cid dock resulting from investigation findings. Construction administration
<br />services provided.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Currie Park Staging Docks, West Palm Beach FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design of 2 public staging docks and dredging design of 2 new access channels to improve public access at an existing
<br />boat ramp. Project management of environmental permits, which included a marine resource assessment and installation
<br />of 15 Uniform Waterway Markers to increase the navigational safety of vessels travelling between the Intracoastal
<br />Waterway (ICW) and Currie Park.
<br />
|