Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br /> <br /> <br /> <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jordon Cheifet, P.E., C.F.M. Coastal Engineer a. TOTAL b. WITH CURRENT FIRM <br />10 4 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Coastal Systems International, West Palm Beach, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Master of Science, Ocean and Resources Engineering, <br />University of Hawaii, 2005 <br />Bachelor of Science, Civil Engineering, Pennsylvania <br />State University, 2002 <br />Professional Engineer – AL, FL <br />Certified Floodplain Manager <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> <br /> <br /> <br />Mr. Cheifet is a coastal engineer with more than 10 years of diverse, professional experience. His wide-ranging expertise <br />includes FEMA coastal floodplain mapping, shore protection structure design, numerical modeling, feasibility studies, and <br />dredging projects. He is capable in multiple numerical modeling techniques and is well-versed in the latest coastal design <br />manuals such as the CEM and SPM. Mr. Cheifet has extensive topographic and bathymetric survey experience where he has <br />utilized RTK GPS, total stations, and echo sounders for topographic and beach profile surveys. His field experience includes <br />above and underwater inspections, GIS/GPS data collection, surveying, and construction oversight. Mr. Cheifet also has <br />extensive knowledge of GIS applications to coastal engineering and has leveraged this technology through desktop, server, <br />and mobile platforms on multiple projects including coastal flooding, wetland restoration, dredging, and offshore wind farm <br />siting. <br /> <br />Mr. Cheifet completes most of his design and construction work using a variety of coastal and civil design software that <br />includes MIKE21-SW, MIKE21-FM, STWAVE, CHAMP, ACES, ArcGIS, AutoCAD, and HYPACK. <br /> <br />PROFESSIONAL AFFILIATIONS: American Society of Floodplain Managers, Florida Floodplain Managers <br />Association <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />40-50 Blossom Way Due Diligence, Town of Palm Beach, FL <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2013 N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Coastal Systems provided coastal engineering consulting services to a private client as part of a due diligence assessment <br />for an oceanfront property acquisition in the Town of Palm Beach. Services included site inspection of coastal structures, <br />assessment of beach erosion issues, interpretation of Town, County, and State beach nourishment data to assess short- <br />and long-term erosion and beach stability trends. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City-Wide Dock Maintenance, West Palm Beach, FL <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 2014 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Above- and underwater investigation of 2 existing fishing piers to evaluate conditions. Issued engineering report <br />summarizing the assessment and provided recommendations and cost estimates for potential structural rehabilitation. <br />Structural design of new fishing pier at El Cid dock resulting from investigation findings. Construction administration <br />services provided. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Currie Park Staging Docks, West Palm Beach FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Design of 2 public staging docks and dredging design of 2 new access channels to improve public access at an existing <br />boat ramp. Project management of environmental permits, which included a marine resource assessment and installation <br />of 15 Uniform Waterway Markers to increase the navigational safety of vessels travelling between the Intracoastal <br />Waterway (ICW) and Currie Park. <br />